Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 420 decisions within 5 km, 1 exact-site or onsite candidate record, and 20 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
20 structured nearby appeal records.
20 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For a ten-year planning permission for the development of an up to 100MW Battery Energy Storage Facility that will provide energy services to the national grid and will be delivered in 4 no. phases. The development will consist of the construction and operation of up to 34 metal containers to store up to a project total of up to 100MW in sealed battery cells each with entrances, fire suppression systems, heating, ventilation and air conditioning systems. The proposed development includes for inverters, control systems, other electrical components, security lighting and ancillary infrastructure and all associated works including security fencing and ancillary grid infrastructure. Gross floor space of proposed works: 2186.6 sqm
To refill an existing disused quarry with inert material
For the development and operation of a 150 to 500 MVA (electrical rating) synchronous condenser. The development which will be located within a site compound of c. 1 hectare east of the existing ESB substation for the purpose of stabilizing the electricity grid will consist of the following elements: The development and operation of a 150 to 500 MVA (electrical rating) synchronous condenser. Compound building housing synchronous condenser generator and flywheel (540 sqm c. 12m high); 5 No. modular containers to house electrical and control equipment (total area of c. 195 sqm, c. 5m high), a generator step-up transformer, auxiliary transformer and electrical plant including and external circuit breaker (c. 8m); 1 No. firefighting water tank and pump, boundary fencing (c. 3m high) and CCTV, c. 50m of underground cabling ducts and cable to the neighbouring ESB Substation, all other ancillary site works including access roads and upgrade of existing local access road. Planning permission is being sought for a duration of 10 years. Gross floor space of proposed works: 540 sqm
For a development consisting of the development and operation of a 150 to 500 MVA (electrical rating) synchronous condenser. The development which will be located within a site compound of c. 1 hectare east of the existing ESB substation for the purpose of stabilizing the electricity grid will consist of the following elements: The development and operation of a 150 to 500 MVA (electrical rating) synchronous condenser. Compound building housing synchronous condenser generator and flywheel (540sqm c. 10m high). Cooling equipment (c. 160sqm, c. 3m high); 5 no. modular containers to house electrical and control equipment (total area of c. 195sqm, c. 5m high). A generator step-up transformer, auxiliary transformer and electrical plant including and external circuit breaker (c. 8m); 1 no. firefighting water tank and pump, boundary fencing (c. 3m high) and CCTV, c. 50m of underground cabling ducts and cable to the neighbouring ESB Substation, all other ancillary site works including access roads. Planning permission is being sought for a duration of 10 years. Gross floor space of proposed works: 540sqm.
For the installation of solar panels over the roof of an existing telecommunications cabin on a steel frame (covering an area of 60 sqm to maximum height of 5 meters above ground level) works to consist of all ancillary development works, including steel uprights
For continued use of the existing quarry to the permitted depth of minus 5 mOD, including drill-ing, blasting, crushing, processing, stockpiling of materials, associated roads and ancillary services (granted under Planning Ref. File No.: 09/1958 and ABP Ref.: PL07.235821); Continued use of open storage areas; Continued use of existing permitted concrete manufacturing facility (granted under Planning Ref. File No. 09230 and 19/517: ABP-304769-19); Continued use of the existing office (granted under Planning Ref. File No.: 09/1958 and ABP Ref.: PL07.235821); Continued use of the existing maintenance shed (granted under Planning Ref. File No. 09610); Continued use of the existing water management system (including settlement lagoons), weighbridge and wheelwash; Lateral extension of the existing permitted quarry area over a previously permitted extraction area (granted under Planning Ref. File No. 06/4125) of c.4.6 ha. area to a final floor level of minus 5 mOD. The total quarry extraction area will be c. 13 Ha.; Restoration of the application area to natural habitat after uses following completion of ex-traction. The proposed development is within an overall application area of c. 27.5 hectares and is for a total period of 22 years (comprising an operational period of 20 years followed by 2 years for restoration). This application is accompanied by an Environmental Impact Assessment Report (EIAR)
The brief summarizes the pattern across all 420 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 181883The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief