Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
17% of nearby decided applications were refused. The site check found 634 decisions within 5 km, 2 exact-site or onsite candidate records, and 27 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
27 structured nearby appeal records.
27 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To carry out works to an existing warehouse unit. This will include the construction of a mezzanine floor to provide office space and staff services. Permission is also sought to provide windows in the front elevation. Gross floor space of proposed works: 71.4 sqm
To construct a mezzanine floor and to retain changes to elevations at Unit 25A. Gross floor space of proposed works: 163.1 sqm
Development will consist of 1) the construction of a new building, comprised of warehouse.2) 2 no. ancillary loading bays and enclosed services yard. 3) a first floor link corridor connecting applicant's existing facility in unit 6 with the adjacent unit 7. 4) works also include the fit out of units 7 & 8b to provide reception, canteen, welfare facilities, production and storage areas, internalised sub-station and switch room at ground level and ancillary office and meeting rooms on a newly constructed first floor mezzanine level. 5)proposed amendments to the existing elevations of 6,7 &8b to include the localized inclusion and reconfiguration of glazing, personnel doors and vehicular access with the provision of signage.6) reconfiguration of car parking spaces, the provision of secure bicycle parking spaces and drop-off/loading bay area.7) all associated site works. Gross floor space of proposed works: 1502.3 sqm
For change of use of part of Unit 9 from office space to light industrial as constructed (area 117m2) pervious permission 181547. Gross floor space of work to be retained: 117 sqm
Of change of use for Unit 8 from Light Industrial to office space as constructed. Permission is also sought for change of use of Unit 9 from Light Industrial to office space to include any associated site development works and services as required. Gross floor space of proposed works 744 sqm. Gross floor space of work to be retained 418 sqm.
For the construction of an extension to existing warehouse, to include associated office space, along with site works with connection to existing services. Gross floor space of proposed works 535sqm
The brief summarizes the pattern across all 634 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 201749The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief