Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 1,010 decisions within 5 km, 7 exact-site or onsite candidate records, and 80 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matched1 of 2 layers are loaded for Clare County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Clare County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Clare County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
80 structured nearby appeal records.
80 matchedNo current-dated citation is loaded for Clare County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
To construct an entrance, dwelling house, domestic garage, advanced waste water treatment system with polishing filter together with all ancillary site development works and services
To construct an entrance, dwelling house, domestic garage, advanced wastewater treatment system together with all ancillary site development works and services
For development which will consist of the construction of 4 No. dwelling houses, garages, proprietary waste water treatment systems and ancillary site works
For the demolition and replacement of existing dwelling house with new dwelling house, new garage, connection to all existing site services and all ancillary site works
To construct an entrance, dwelling house, domestic garage, together with all associated site works, foul sewer drainage network, rising main, pumping station and connection to public sewer
To amend planning permission P21/787 by changing from a foul sewer drainage network, rising main, pumping station and connection to public sewer to installation of an onsite advanced wastewater treatment system with a low pressure pipe distribution polishing filter
The brief summarizes the pattern across all 1,010 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 19843The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief