Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 1,103 decisions within 5 km, 2 exact-site or onsite candidate records, and 75 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
75 structured nearby appeal records.
75 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To a) convert existing garage to accommodation, b) construct side and rear extensions c) carry out alterations and fenestration changes to existing dwelling house together with all associated site development works and services
To (a) construct an extension to existing dwelling house (b) carry out internal alterations and modifications together with all ancillary site development works and services
Of minor alterations to external elevations of premises
Of existing concrete mezzanine area (raised storage area) located within an existing storage warehouse on Quin Rd, Business Park, Ennis, Co Clare. The mezzanine has been in place since 2013 The mezzanine area is accessible using existing concrete access stairs located on the Northeast corner of the building. The mezzanine area provides an additional 129m/sq of storage space.
For development which consists of the proposed change of use from existing storage use to office use
To carry out the following development: 1) Change of use and sub-division of an existing industrial unit ( Carpentry workshop and Showrooms ) into separate units as follows: a) Civil Defence Headquarters, Fleet Storage Depot, Training Room and ancillary office accommodation, (b) Incubation / Enterprise space. (c) Records Management Centre and associated storage. 2. Erect a 10 metre high Ultra High Frequency radio antenna for Civil Defence communications. 3. Carry out alterations to existing elevations, to include new windows, canopies and door openings and install associated signage. 4. Connect to existing onsite services ( a number of separate connections for water, wastewater and electricity ). 5. Construct new boundary wall. 6. Create an entrance on eastern boundary of the site. 7. Associated site works and signage
The brief summarizes the pattern across all 1,103 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 211340The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief