Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 14 decisions within 5 km, 1 exact-site or onsite candidate record, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construct new dwelling house, construct new domestic garage, construct new effluent treatment system with all associated works, construct new domestic entrance off public road and carry out all required ancillary works on site
Synchronous condenser/flywheel, located within a fenced compound of c.0.85 ha consisting of: machine building to house equipment including the synchronous condenser, flywheel, lube oil skid, air compressor and pumps. Supporting items of plant; cooling equipment, c.6m high modular containers to house electrical and control equipment, 2 auxilliary transformers and electrical plant including external circuit breaker, HV electrical compound with electrical switchgear and main step-up transformer and new c.200m underground cable grid connection to the Bellacorick 110kv substation; diesel generator, fire water tank, underground oil separator and collection pit, services connections including electrical, water and wastewater and constructed wetland connecting ot Owenmore River; 3 office/welfare buildings and 2 spare parts containers. External lighting poles c. 9m, lightning monopole and Scada communications mast,. 4 fire walls around main step up transformer c. 8m high, 2 fire walls either side of auxilliary transformers c. 5m high, 3 firewalls around cooler for main transformer, 8m high. Ancillary site clearance and developemt works including provision of areas of hardstanding, internal access roads, laydown area, car parking and connection to site services networks. The development will be bounded by one c. 3.6m high palisade fence on the east side and one 5m high palisade fence to the south side. Site access will be by means of a new c. 3.6m high palisade gate and a second 3.6m sliding gate accessed from the Shranakilla Road off the N59. Permission sought is for 10 years. NIS submitted with application.
A c.3 MW CAPACITY BATTERY STORAGE FACILITY AND WILL - SUBJECT TO DETAILED DESIGN, COMMERICAL AND TECHNICAL CONSIDERATIONS INCLUDE: 2 NO. BATTERY STORAGE CONTAINERS (UP TO 16.6m X 2.9M X 3.7M HIGH) A SINGLE-STOREY ELECTRICAL CONTROL ROOM (c.77sqm), ANCILLARY ELECTRICAL PLANT INCLUDING 5 NO. TRANSFORMERS, INVERTERS AND OTHER CONTAINERISED PLANT, A c.15.5M HIGH LIGHTNING MAST AND c.18m HIGH SCADA COMMUNICATIONS MAST, c.2.6m HIGH BOUNDARY FENCE AND ACCESS GATE, c.100m LONG ACCESS ROAD CONNECTING WITH THE EXISTING SUBSTATION ACCESS ROAD AND ANCILLARY SITE WORKS INCLUDING THE INSTALLATON OF SITE SERVICES
DEVELOPMENT WILL CONSIST OF 1 NO. 4.5M X 3.5M X 3M HIGH (14.6SQM) PREFABRICATED GLASS REINFORCED PLASTIC (GRP) ANALYSER KIOSK, 1NO. 3M X 2.5M X 2.3M HIGH (6.8SQM) PREFABRICATED GRP GENERATOR KIOSK AND 1 NO. 3.5M X 3.5M X 3M HIGH (11.3SQM) PREFABRICATED GRP ANALYSER SUPERVISORY KIOSK. THE DEVELOPMETN WILL ALSO INCLUDE THE REPLACEMENT OF THE EXISITNG 2.45M HIGH CHAIN LINK PERIMETER FENCING WITH NEW 2.4M HIGH PALISADE SECURITY FENCING/GATES AND ALL ASSOCIATED SITE WORKS.
DECOMMISSIONING AND REMOVAL OF ELECTRICAL PLANT AND ASSOCIATED STRUCTURES AND THE DEMOLITION OF THE EXISTING FENCE ALONG A PORTION OF THE NORTH EASTERN BOUNDARY OF THE EXISTING SUBSTATION, THE EXTENSION OF THE EXISTING SUBSTATION BY 3970sq m TO ACCOMMODATE c. 30m OF OVER HEAD 110kV CONDUCTOR CONNECTING TO AN EXISTING 110 kV BUSBAR AND ASSOCIATED STRUCTURES c. 16m HIGH, INCORPORATING LIGHTENING PROTECTION MEASURES, 1 NO. 38/110kV BUNDED TRANSFORMER, AND ADDITIONAL 38 kV ELECTRICAL EQUIPMENT SUCH AS ARC SUPPRESSION COIL, CABLE CHAIRS/SEALING ENDS, ETC. ALL ANCILLARY WORKS WITHIN THE SITE INCLUDING THE PROVISION OF ADDITIONAL AREAS OF HARD-STANDING, INTERNAL ACCESS-WAYS, ASSOCIATED DRAINAGE WORKS AND ALL WORKS ASSOCIATED WITH REMOVAL, RELOCATION, REPLACEMENT AND INSTALLATION OF UNDERGROUND CABLES, ELECTRICAL PLANT AND SWITCHGEAR ON THE SITE, AND A 2.6m HIGH PALISADE PERIMETER FENCE WITH A DEDICATED ACCESS GATE
The development will consist of a 114 Megawatt gas fired peaking power plant (which will be capable of running on a mix of natural gas and hydrogen) comprising the ’electricity generating station’. The electricity generating station will comprise of 2 no. open cycle gas turbine (OCGT) generators each consisting of an air intake filter system, exhaust stack (28 metres high), air vent stack, inter cooler system, turbine control room and transformers. In addition the development will include: • Above Ground Installation (AGI) to facilitate connection to the Gas Network, with compound area of 1,600 m²; • 3 no. Gas AGI buildings; • Admin & welfare block; • Electrical Substation with area of 3,800 m²; • 1 no. Substation building; • Electrical building; • 3 no. Secondary fuel storage tanks with volume of 3,600 m³; • Fire Water Storage Tank & Pumphouse; • Sludge Tank & Pump House; • Resurfacing, Repair and Improvement of Existing Site Entrance; • Replacement Bridge; • Gatehouse; • Internal Access Roads; and • Associated Grid Connection Works within the L52925 Public Roadway. The development will include the provision of 12 no. parking spaces, footpaths, landscaping, fencing and all other associated site development plant and equipment and other works including surface water and foul wastewater drainage infrastructure. The development includes for the demolition and removal of a dwelling (112 m²) and associated farmyard barn and outbuildings (94 m², 15 m², 17 m² and 45 m²), all within a total overall application boundary of 4.35 ha. It should be noted in respect of this planning application that permission is sought for a period of 25 years.
The brief summarizes the pattern across all 14 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 221081The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief