Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 56 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Place 4 no. glamping pods on site, change of use of existing dance hall to include toilet and shower area for glamping pods and sports hire/sale shop, upgrade effluent treatment system on site, construct new entrance on to public road and carry out all required ancillary works on site
RETAIN EXISTING PUBLIC HOUSE AND ATTACHED DWELLING HOUSE, AND CONSTRUCT NEW EFFLUENT TREATMENT SYSTEM ON SITE
CONSTRUCT AN ECOLOGICAL EDUCATION CENTRE CONSISTING OF FOUR BUILDING ELEMENTS ENCLOSING A COURTYARD TYPE ARRANGEMENT. ELEMENT A - AN ADMINISTRATION BLOCK COMPRISING RECEPTION, OFFICE SPACE, KITCHEN, DINING AND SERVICE SUPPORT AREAS. ELEMENT B - TWO STOREY ACCOMMODATION BLOCK COMPRISING AT GROUND FLOOR, A COMMON ROOM, FOUR NUMBER BEDROOMS, ANCILLARY SPACES AND AT FIRST FLOOR, SIX NUMBER BEDROOMS AND ANCILLARY SPACES. ELEMENT C - A SINGLE STOREY FLAT ROOF BLOCK COMPRISING THREE NUMBER WORKSHOPS. ELEMENT D - A BARREL ROOFED STRUCTURE COMPRISING STORAGE AREA INCLUDING PREMISSION FOR A CANOPY ELEMENT TO EXTERNAL COVERED WALKWAY. PERMISSION IS ALSO SOUGHT FOR EFFLUENT TREATMENT UNIT AND TERTIARY SYSTEM, UPGRADE OF EXISTING ENTRANCE ONTO PUBLIC ROAD TO INCLUDE ALL OTHER ANCILLARY SITE SERVICES AND DEVELOPMENT WORKS ASSOCIATED WITH THIS PERMISSION
Construction of a dwelling house, domestic shed, proprietary sewage treatment system and all associated works
CONSTRUCTION OF A DWELLING HOUSE, DOMESTIC SHED, PROPRIETARY SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE WORKS
CONSTRUCTION OF A NEW DETACHED DWELLING HOUSE, DOMESTIC GARAGE, PROPOSED ON SITE EFFLUENT TREATMENT SYSTEM AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 56 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 221174The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief