Executive snapshot
7% of nearby decided applications were refused. The site check found 159 decisions within 5 km, 2 exact-site or onsite candidate records, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of a livestock underpass, effluent holding tank and all associated site works
Construction of a livestock underpass, effluent holding tank and all associated site works
CONSTRUCT A NEW DWELLING HOUSE, DETACHED GARAGE, INSTALL A WASTEWATER TREATMENT SYSTEM AND POLISHING FILTER AND ALL ASSOCIATED SITE WORKS
ERECT AN EXTERNAL STEEL MILK REFRIGERATED TANK ADJACENT TO THE DAIRY ON HIS LAND
RETAIN 3 NO. TEMPORARY PORTACABINS WITHIN THE EXISTING AIRPORT COMPLEX TO FACILITATE A WAITING AREA FOR PASSENGERS AND OFFICE SPACE FOR ADMINISTRATION AND OPERATION PURPOSES. THE PERMISSION SOUGHT IS FOR A PERIOD OF SEVEN YEARS.
Planning permission to demolish the existing agricultural storage shed and part of the existing dwelling house, to refurbish and extend the dwelling house along with the existing attached outbuilding and to install a Wastewater Treatment Unit (WWTU) and polishing filter to serve proposed dwelling. Permission is further sought to close the existing vehicular entrance and create a new vehicular entrance and access road for both the dwelling house and farm along with all necessary ancillary site & landscaping works necessary to complete the development
The brief summarizes the pattern across all 159 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2460474The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief