Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 2,525 decisions within 5 km, 5 exact-site or onsite candidate records, and 209 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
209 structured nearby appeal records.
209 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
1 no. two storey 3 bedroom detached dwelling house with off street car parking, connection to main sewer and associated site works
7no. two storey, 3 bedroom, terraced dwelling houses, all with off street car parking, connection to main sewer, public lighting and associated site works
The re-location of the existing driveway to access the family property. The proposed works will also include the raising of the boundary walls, located to the front of the dwelling, to a height greater than the exempted height of 1.2m
Removal of existing porch and construction of a new porch and bay window extension to the front of dwelling with lean-to roof over and removal of existing domestic store at the side of the dwelling and construction of an extension at the side and rear of dwelling and all associated site works
A residential development comprising 31no. residential units, (1no. detached house, 6no. semi-detached houses, 14no. terrace houses, 10no. duplex units in a 3 storey block), construction of all associated roads, site entrance, boundary treatments, footpaths, car parking, street lighting, demolition of an existing dwelling and sheds, and all ancillary site development works
The change of use of the 958.5 sq.m gross floorspace vacant two storey over basement building from pub/restaurant use a community resource hub to be operated by MS Ireland. The proposal will comprise of: At basement - 3 no. meeting rooms with ancillary office; Staff canteen; Staff changing area; Ancillary areas – circulation, WC, showers, storage, etc. At ground floor: Flexible studio; Gym; Reception / lounge area with kitchenette; Meeting room; Admin office; 1 no. treatment room with office; Ancillary areas – circulation, WC, showers, storage, etc. At first floor: Open plan office; Ancillary areas – circulation, WC, showers, storage, etc. Externally: Soft landscaping to north; Bicycle shelter with sheltered and secure parking for 10 no. bicycles; Refuse storage area with capacity for 3 no. 1,100 litre bins, to allow for recycling and waste segregation; 1 no. MS Ireland signage at first floor level, backlit, to north elevation; 1 no. MS Ireland signage at first floor level, backlit, to east elevation; 1 no. backlit signage panel adjacent to main entrance door at ground floor level; replacement of existing timber cladding with timber effect composite or similar. The proposed development includes all associated and ancillary works, including internal fit-out works and new AOVs to roof.
The brief summarizes the pattern across all 2,525 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 25220The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief