Dormer bungalow with septic tank and percolation area along with new entrance
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
Knockatillane , Manor Kilbride , Blessington
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
19% of nearby decided applications were refused. The preview found 214 nearby planning records within 5 km where a location match is available.
- Matched source
- 181153
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest planning decisions
1.Retention for stone and brick finish to front and side elevation along with double door to rear, 2. retention for single storey garage to side of existing dwelling and 3. retention for conversion of attic to storage room with 2 number velux windows to the front and two number gable windows
1.Full planning permission to upgrade existing septic tank system to treatment plant and soil polishing filter along with 2. Retention permission for sheds to rear of dwelling and all associated site works
A. Construction of sunroom to the south west gable. B. Construction of garage and ancillary rooms to the north east gable. C. Conversion of previous car port to habitable area. D. Enclosure of porch area
Erect a dwelling with services and domestic garage
Reconstruction of fire damaged house including minor alterations and increase (1.3 sqm) to floor plan and change to roof construction and finish
The brief summarizes the pattern across all 214 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 181153The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief