Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 152 decisions within 5 km, 1 exact-site or onsite candidate record, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Limerick County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Limerick County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Limerick County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
4 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedNo current-dated citation is loaded for Limerick County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
The demolition of the existing three span bridge and construction of a new single span bridge consisting of piled abutments and a stell truss superstructure to facilitate the potential future re-introduction of freight traffic on the Limerick to Foynes railway line at Churchfield/Island MacTeige. The existing intermediate piers will remain in place in a non load bearing capacity. The works also includes the temporary relocation of a salt marsh during the construction of the bridge structure. A Natura Impact Statement has been prepared for the development
Works to facilitate an expansion of the disposal capacity at the existing Bauxite Residue Disposal Area (BRDA). The works will generally consist of the construction of rock fill embankments at the perimeter of the BRDA, offset internally and founded on the previously deposited and farmed bauxite residue, in 2 m high vertical lifts. The proposed development will result in the footprint of the BRDA decreasing as it increases in height. The proposed development will result in a c.12m increase in height (over that previously permitted under Limerick County Council Ref. 05/1836; An Bord Pleanála Ref. PL13.217976) to a maximum height of c.44m OD upon closure. The proposed expansion of the BRDA will provide for the deposition of an additional c. 8.0 million m3 bauxite residue over the lifetime of the development. The proposed development also provides for an expansion of the existing capacity of the Salt Cake Disposal Cell (SCDC), which is located within the BRDA through a vertical extension of the exiting perimeter wall and associated cell lining resulting in a c.2.25m crest height increase of the existing cell to c.31.25m OD and a maximum overall height of c.35.50m OD upon closure. The increase in capacity of the SCDC will provide for the storage of an additional c. 22,500 m3 of salt cake. Additional works include a c.3.9ha expansion of the permitted borrow pit (Limerick City and County Council Ref. 17/714; An Bord Pleanála Ref. ABP-301011- 18) to the east of the BRDA resulting in a total borrow pit area of c.8.4ha with a maximum depth of c. 8.5 m O.D and providing for an additional 380,000m3of rockfill with blasting and crushing of rock to occur between April and September each year. Further works include upgrades to the water management infrastructure to accommodate the BRDA development; the continued use of a stockpile area for rock and top-soil storage to the south east of the BRDA; use of top-soil and rock materials for the landscaped restoration and closure of the BRDA (including SCDC); restoration of the extended borrow pit extraction area; lighting; spillway ramps (drainage channels); revised boundary treatments and ancillary associated works above and below ground. Aughinish Alumina Limited carries out an activity on the site requiring an Industrial Emissions Licence (Licence Reg. No. P0035-07). This application is accompanied by an Environmental Impact Assessment Report and Natura Impact Statement - https://www.pleanala.ie/en-ie/case/312146
Construction of an agricultural slatted unit with effluent storage tank and all associated site works
Construction of a two storey dwelling house, detached domestic garage, front boundary entrance walls, mechanical aeration unit with polishing filter system with all associated site works
A field access gate to folio plot LK2908 including, ancillary works, alteration to the existing road embankment and road grass margin off the L6188 Durnish to Foynes Port Access Road
A field access gate to folio plot LK24546 including, ancillary works, alteration to the existing road embankment and road grass margin off the L6188 Durnish to Foynes Port access road.
The brief summarizes the pattern across all 152 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 181236The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief