Applications tied to the site
Partial coverage9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
18% of nearby decided applications were refused. The site check found 609 decisions within 5 km, 9 exact-site or onsite candidate records, and 64 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matched1 of 2 layers are loaded for Wicklow County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Wicklow County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Wicklow County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched1 prompt is backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 matched64 structured nearby appeal records.
64 matchedCitations are current-dated and carry policy name, section, page and source URL from the Wicklow County Council development plan.
2 matchedOpen preview
Open preview
Removal of existing window from south west side elevation, enlarge existing window ope to form new door ope for access to new 11.35 sqm rear first floor decking, new stairs from first floor decking for access to rear garden and associated site works
The removal of existing window from the south west side elevation. Enlarge existing window OPE to form new door, OPE for internal access from dwelling to new 12.13 sq m first floor composite decking. New 1.90m obscured glazed screening panels to south west side elevation to eliminate overlooking to neighbours property. New composite decking to ramp for side access from new decking to rear garden and site access and associated site works
(i) access ramps, steel hand rails, side gate, etc at the front, side and rear of the existing dwelling; and (ii) Planning permission for the construction of an additional access ramp to connect existing ramp to proposed rear balcony (12.13 sq m.) with 3 No. 1.90m high obscured glazing panels and stainless steel guard rails to south west elevation to eliminate overlooking to neighbours property; removal of existing window from south west elevation; enlarge window OPE to fit new door for rear access to proposed balcony, and all ancillary site works
Removal of existing window from south west side elevation, enlarge existing window ope to form new door ope for access to new 11.35 sqm rear first floor decking, new stairs from first floor decking for access to rear garden and associated site works
To replace an existing window at first floor to the rear elevation with a double door screen for access to a new 14.57msq balcony with 2m high obscured glazing panels to balcony perimeter at south west and south east elevations to eliminate overlooking neighbours property with steel stairs down to ground level to the south east elevation
The part conversion of 42.02sq m of existing ground floor plan to granny flat and associated site works
The brief summarizes the pattern across all 609 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 191365The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief