Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 269 decisions within 5 km, 5 exact-site or onsite candidate records, and 21 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
21 structured nearby appeal records.
21 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Planning permission to modify a previously granted planning permission to facilitate an increased output from 10 MW to 20MW at the Coppenagh Solar Park development permitted pursuant to permission ref no: 22/272. Increased output is being facilitated arising from improved technological advancements and availability of Grid Capacity. No other alterations to design, siting layout etc are proposed.
Application for a five year planning permission for the development of the following elements: The erection and operation of a photovoltaic energy development which includes the erection of a c.20.9 ha fixed panels on ground mounted frames with an export capacity of c. ten mega-watt, 1no. energy storage compound, customer switchgear container, 1no. DSO substation which will be connected to the national grid, electrical transformer and inverter units on an overall site area of c. 22.45 ha, underground cabling and ducting, spare equipment container, boundary fencing, security entrance gates, CCTV, internal access road and all associated ancillary activities. The proposed development will have a projected lifespan of 35 years.
To construct a single storey extension to the side and rear of existing single storey dwelling, a single storey shed to the rear of existing dwelling, new waste water treatment system and percolation area, new bored well, widening of existing entrance and all associated site works
The construction of: 1) a new single story dwelling house, domestic garage, domestic well, onsite wastewater treatment plant and percolation area, along with all associated site and landscaping works, 2 ) New Agricultural Farm Yard consisting of, Agricultural shed with slatted tank, lay back, livestock handling facility and hay storage, a stable block and machinery store shed, dung stand, bailed silage stand, enclosed yard and hard standing area, 3) Alteration and relocation of existing lane entrance from public road
A detached home office, WC, gym, garage area to the front with attic storage and all associated site works to the rear of existing two storey dwelling
A storey and a half extension to existing cottage and detached garden room to the rear of existing dwelling and all associated site works
The brief summarizes the pattern across all 269 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22272The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief