For development at this site in the townlands of Ballyvonnavaum TD, Coolshamroge TD, Cloonmore TD, Deerpark TD, and Manusmore TD, Ennis, Co Clare. The development will consist of planning permission for a period of 10 years to construct and complete a Solar PV Energy development with a total site area of 27.34 hectares, to include inverter station modules, solar PV panels ground mounted on support structures, internal access tracks, security fencing, electrical cabling and ducting, CCTV and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works including works relating to the access to the site. The solar farm would be operational for 35 years. A Natura Impact Statement has been prepared in respect to the application for planning permission
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
Ballyvonnavaum TD Coolshamroge TD Cloonmore TD Deerpark TD , and Manusmore TD , Ennis Co Clare
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
7% of nearby decided applications were refused. The preview found 381 nearby planning records within 5 km where a location match is available.
- Matched source
- 22586
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest planning decisions
For development which will consist of a 10-year permission for a Synchronous Condenser and Battery Energy Storage System (BESS) across a site of approximately 2.97 hectares, co-located with an existing solar farm. The development will have an operational capacity of c. 50 MW and will consist of the construction of battery energy storage system units, power conversion units, a synchronous condenser, control modules and rooms, transformers and bunds, cooling equipment, a generator circuit breaker, an emergency diesel generator with associated fuel tank, water tank, underground cabling, fencing with access gates, CCTV and lighting posts, a temporary construction compound, new and upgraded access tracks, and associated landscaping, and ancillary works. The development would be in operation for up to 30 years. A Natura Impact Statement (NIS) has been submitted with this application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
For the construction of a dwelling house and garage, proprietary waste water treatment system, new entrance and all ancillary works
To Extend the Appropriate Period to construct a dwelling house, separate garage, sewerage treatment system with percolation area and including all ancillary works
For development which will consist of the construction of a single storey dwelling house, garage, a proprietary waste water treatment system and ancillary site works
To construct domestic garage/store, plus all ancillary site works
The brief summarizes the pattern across all 381 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 22586The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.