Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
20% of nearby decided applications were refused. The site check found 339 decisions within 5 km, 2 exact-site or onsite candidate records, and 18 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Kildare County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Kildare County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Kildare County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
18 structured nearby appeal records.
18 matchedCitations are current-dated and carry policy name, section, page and source URL from the Kildare County Council development plan.
1 matchedOpen preview
Open preview
For a high-power electric vehicle charging hub and associated infrastructure, consisting of the following: (i) installation of 20no. electric vehicle charging bays and 10no. charging points, (ii) Installation of new canopy with associated illuminated signage (iii) new modular ESB Substation, (iv) associated revisions to existing landscaped area including relocated lighting columns, the provision of new lighting columns, new road markings and pedestrian walk way and, (v) all other associated drainage and site development works
For (i) the construction of a car wash facility, comprising of one automatic wash bay, associated car wash plant room and payment terminal, (ii) the installation of an above ground self-bunded MGO tank to east of the existing HGV fuel forecourt, (iii) the relocation of existing air/water/vacuum service area, (iv) the provision of new road markings and, (v) all other associated site drainage, site development and landscaping works
Construction of one modular classroom together with all its associated site works. Revised by Significant Further Information which consists of retention permission for the foundations to the proposed modular building and for the partially constructed canopy walkway. Planning Permission is sought to complete the walkway and install the modular classroom
(i) establishment of an inert soil waste recovery facility to provide for the importation of approximately 1,200,000 tonnes of natural inert waste materials, principally excess soil, stone and / or broken rock to backfill the pit void to former ground level and improve lands currently in agricultural use. The development will be carried out on a phased basis and will be completed within 8 years; (ii) share use, with the existing Kilsaran concrete manufacturing and waste facilities, of existing site and services infrastructure including site office, staff welfare facilities, weighbridge (with dedicated office), wheelwash, hardstand areas, fuel storage tanks and site access; (iii) use of section of existing concrete block curing shed as a waste inspection and quarantine facility; and (iv) temporary stockpiling of topsoil pending re-use as cover material for final restoration of the site. The proposed development requires a waste licence from the Environmental Protection Agency. An Environmental Impact Statement (now referred to as an Environmental Impact Assessment Report (EIRA)) will be submitted
Retention of constructed (a) bay window, (b) sun-room and (c) domestic sheds (4 off) and renovation of same, one of which to be converted to domestic office
(a) existing dormer style domestic garage with home office as constructed within the curtilage of the existing house for the purposes ancillary to the enjoyment of the house, (b) existing single storey timber chalet style playroom and study space as constructed within the curtilage of the existing house for the purposes ancillary to the enjoyment of the house, (c) existing place of worship for personal use as constructed within the curtilage of the existing house for the purposes ancillary to the enjoyment of the house, (d) existing boundary fence to eastern boundary and all associated site works. Permission to upgrade existing septic tank to secondary effluent treatment system
The brief summarizes the pattern across all 339 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2461316The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief