Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 2,781 decisions within 5 km, 4 exact-site or onsite candidate records, and 241 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
241 structured nearby appeal records.
241 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of a standalone office building, re-establishment of an existing entrance off the main Galvone Industrial Estate road to provide access for the public to the southside of the site, an air exchange unit, a new fire escape door to the east elevation of the existing building, an empty skip storage area, an increased capacity to allow for the acceptance of not more than 24,500t per annum including additional waste streams collected under the normal operations of a waste management company, and all associated site works
The continued retention of the capacity granted under P18/1278 i.e. to allow for the acceptance of not more than 24,500t per annum including additional waste streams collected under the normal operations of a waste management company along with all associated works
Construction of a new extension(1103m2), new weighbridge office(11.5m2), raising the height of current building number one and part of the building number two by 1.5m, total roof area 1635m2to be raised, relocating the existing weighbridge onsite, new loading dock, new ESB substation and switch room(43.5m2), relocating and line marking of carparking spaces onsite, new bicycle racks and electrical charging points, new external security lighting, new screen planting at the rear of the building, minor changes of the existing north, west and south elevation of building one to include additional roller doors and fire escape doors, minor changes to the existing north elevation of building two to include additional fire escape doors, proposed new rainwater harvesting tank, firefighting water storage tank, oil interceptor and traffic bollards, the works to include all associated site services. The application is accompanied by a Environmental Impact Assessment Report(EIAR). The application relates to an existing waste facility permit WFP L 2021 12 001 01 R3 T1
The construction of a car park and yard extension, construction of a new boundary walls and fencing, alterations to existing entrance and gate, alterations to existing external cladding, erection of new signage, construction of truck loading dock and canopy and all ancillary site works
Vehicular entrance and parking on driveway to include all ancillary works
A single storey extension to the rear of the dwelling and retention permission sought for bay window with slate roof to the front of the dwelling
The brief summarizes the pattern across all 2,781 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 181278The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief