Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 264 decisions within 5 km, 1 exact-site or onsite candidate record, and 12 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
12 structured nearby appeal records.
12 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Demolition of existing sludge bed. Construction of new inlet works, storm tank, picket fence thickener, pumping stations, control buildings and all ancillary site works
An amendment to the design of the foul main drainage strategy associated with the works currently underway at the new post-primary school Colaiste Chiarain, previously granted permission under Planning Ref. no. 16/50. Permission is sought to change the foul sewer design strategy from the previous pumped solution as submitted under the foregoing planning reference to a gravity fall sewer, terminating at the existing Croom waste treatment facility and for all associated site works
The extensions and alterations to existing house, new garage, alterations to existing site entrance, new waste water treatment system with percolation area and all ancillary site works
The construction of an entrance lobby with balcony over and all ancillary site works
The construction of a new sports ground for Croom United Football Club which will consist of; one astroturf soccer pitch with lighting and two grass pitches, a single story clubhouse of gross floor area 177m2 containing dressing rooms and a gym, the widening of the existing vehicular site entrance, the provision of vehicle parking including accessible spaces and EV charging stations, bicycle parking, a refuse store, new foul and water mains connections, the provision of SuDS measures including attenuation tanks, swales, and a raingarden with all associated landscaping and associated site works
Construction of an extension to the side and rear of the dwelling, replace existing flat roof at rear with a pitched roof with associated site works
The brief summarizes the pattern across all 264 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 191201The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief