Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 224 decisions within 5 km, 4 exact-site or onsite candidate records, and 18 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
18 structured nearby appeal records.
18 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For the construction of a 36 metre high free standing lattice communication structure and its associated antennae, communication dishes and ground equipment within a 2.4 m high palisade fence compound at ESB's existing Flagford 220kV substation at
The application site is c.3.0 hectares. Permission is sought for a battery energy storage facility which will comprise of rechargeable battery units contained within up to 31 No. 40 foot containers on site and the associated development of unit substations, a 110 kV substation, security fencing, security cameras, lighting mast, new site roads and new vehicular access. The facility will connect into the adjoining Flagford ESB Substation via underground cable. All associated site development, landscaping and boundary treatment works above and below ground. Permission for development within the townland of
To erect a dwelling house and domestic garage and construct a septic tank system and percolation area and all associated site works at
Permission for (A) Construction of a 2 storey 4 bedroom dwelling, (B) Domestic garage and (C) Form new entrance piers with setback post and rail fence. C/W Wastewater Treatment System to EPA CoP 2021 EN 12566-3 standards and all other site works as required at
Permission for the renovation of an existing single-storey dwelling, including the removal and replacement of internal floors, partitions, doors, windows, and roof; demolition of the existing side extension and detached garage; construction of a new entrance to the dwelling and a two-storey rear extension to accommodate additional household spaces, including an open-plan kitchen/dining/living area, office/gym, utility room, bedrooms, and bathrooms; construction of a replacement detached garage; decommissioning of the existing septic tank and installation of a new wastewater treatment system at a new location on site; relocation of the existing vehicular entrance to the north-west side of the site; together with all associated site works at
Retention Permission to retain dwelling house, domestic garage as constructed and re-location of entrance from that granted under Planning Permission Ref. No. 04/1934 and all associated works at
The brief summarizes the pattern across all 224 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19396The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief