Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
19% of nearby decided applications were refused. The site check found 285 decisions within 5 km, 1 exact-site or onsite candidate record, and 25 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
1 prompt is backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 matched25 structured nearby appeal records.
25 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) Proposed 7 No. 4 bedroom detached split level 2-storey houses & ancillary site development works including estate road at Ballinacor West, Barndarrig, (2) Proposed foul sewer connection to existing public sewer & surface water sewer outfall to soakaway / watercourse on adjoining lands at Ballinacor East, Barndarrig
Proposed residential development (10 no. dwellings) comprising of 5 No. 5 bedroom detached 1.5 storey houses, 4 No. 4 bedroom 1-2 split level detached houses & 1 No. 3 bedroom detached house & ancillary site development works including site services, estate roads, public open space & boundary treatment
Expanded vehicular parking (c. 238m2) to the south east portion of the site into a former greenfield area (permission); roof cover (c. 60m2) (permission) over customer sit-down area including wooden benches for customer recreation and dining purposes (c. 60m2) (retention permission); 7 no. open container storage sheds (c. 99m2 in total) along the western boundary of the curtilage of this site, adjacent to the service station building, for the storage and display of retail goods (retention permission); prefabricated single storey wooden building (c. 70m2) for security accommodation in the south-western portion of site (retention permission); prefabricate wooden shed (c. 13.5m2) for storage use adjacent to western elevation of the single storey wooden building (retention permission); wastewater treatment services (c. 1.54m2) to serve the prefabricated chalet style building for (retention permission); and all associated ground hard core, paving and soft landscaping works
Part 8 - submissions should be made to the relevant department as specified on the site notice (not to the Planning Department) - construct 20 No. Social Housing Units and all associated works. The accommodation shall consist of the following: 4 No. 3 bed 2 storey houses, 10 No. 2 bed 2 storey houses, 3 No. age-friendly 1 storey houses and group housing consisting of 1 No. 2 bed and 2 No. 3 bed detached houses. This is a Part 8 and not a Part 4 application. Please disregard decision date.
Change of use (removal of planning condition no. 4 of Planning Ref. No. 00/3494 for house No. 9) from restricted use as a dwelling to use by all classes of persons.
A store at the rear
The brief summarizes the pattern across all 285 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 201322The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief