Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 178 decisions within 5 km, 2 exact-site or onsite candidate records, and 9 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Mayo County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Mayo County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Mayo County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
9 structured nearby appeal records.
9 matchedCitations are current-dated and carry policy name, section, page and source URL from the Mayo County Council development plan.
1 matchedOpen preview
Open preview
CONSTRUCT NEW DWELLING HOUSE, PROPRIETARY EFFLUENT TREATMENT SYSTEM, PERCOLATION AREA INCLUDING ALL ANCILALRY SITE WORKS.
CONSTRUCT A CATTLE UNDERPASS AND EFFLUENT TANK UNDER THE PUBLIC ROAD AND ASSOCIATED SITE WORKS
CONTINUED USE AND OPERATION OF THE EXISTING LIMESTONE QUARRY (C. 3.97 HA) INCLUDING WHEELWASH, SETTLEMENT LAGOONS, PORTABLE OFFICE, WORKSHOP AND ALL ASSOCIATED ANCILLARY ACTIVITIES, PERMITTED UNDER PLAN REG. REF. NO. 02/1931 AND 08/1563; INSTALLTION OF A PACKAGED WASTEWATER TREATMENT SYSTEM AND POLISHING FILTER
CONSTRUCT A ROOFED COLLECTING YARD, A CALF SHED, A FARM YARD MANURE SHED AND ALL ASSOCIATED SITE WORKS
The development will consist of an Inert Waste Recovery Facility within an application area of c. 1.8 Ha.
1.0 HECTARE EXTENSION TO AN EXISTING AUTHORISED QUARRY AND WILL COMPRISE OF THE FOLLOWING: EXTRACTION OF MATERIAL BY BLASTING MEANS DOWN TO A LEVEL OF -2.0mOD; TRANSPORTATION OF EXTRACTED MATERIAL TO THE EXISTING QUARRY FOR PROCESSING; LANDSCAPING AND RESTORATION OF THE SITE UPON COMPLETION OF WORKS AND ALL ASSOCIATED ANCILLARY FACILITIES. THE APPLICANT IS SEEKING A 10 YEAR PERMISSION
The brief summarizes the pattern across all 178 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 20644The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief