Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 173 decisions within 5 km, 3 exact-site or onsite candidate records, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
The agricultural entrance and roadway and PLANNING PERMISSION to complete the agricultural entrance and roadway with all associated site works to my agricultural lands
To build a bungalow residence, detached garage, waste water treatment and for to use and share the existing vehicular entrance and all associated site works
An existing wheelwash, weighbridge, office and hardcore area for an indefinite period
Development on this site of circa c.7.48 hectares. The development will consist of a 10-year permission for the construction of a Solar PV Energy Development comprising installation of Solar Photovoltaic (PV) panels on ground mounted frames/support structures within existing field boundaries, underground cabling and ducting, 1 no. customer control building, 1 no. switchgear and transformer building, site perimeter (stock proof) security fence and associated access gates, maintenance track, landscaping and all associated site development works. A temporary construction compound will be provided and vehicular access is via the existing access route from N24 serving the Ballydine 110kv substation to south-west of the site. This application relates to development for the purposes of an acitivity requiring a licence under the Industrial Emissions Directive. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application.
The construction of (i) an extension to loose shed with cubicle and slatted tank and storage area, (ii) soiled water tank and all associated site works
The construction of (i) milking parlour incorporating dairy plant rooms, meal bin, holding yard with crush/drafting yard, underground effluent tank with flow channel (ii) extension to shed to add cubicle shed with underground effluent tank and all assorted site works. Demolition is also required for 3 loose sheds and derelict dwelling
The brief summarizes the pattern across all 173 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 20966The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief