Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 173 decisions within 5 km, 3 exact-site or onsite candidate records, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The agricultural entrance and roadway and PLANNING PERMISSION to complete the agricultural entrance and roadway with all associated site works to my agricultural lands
To build a bungalow residence, detached garage, waste water treatment and for to use and share the existing vehicular entrance and all associated site works
An existing wheelwash, weighbridge, office and hardcore area for an indefinite period
Development on this site of circa c.7.48 hectares. The development will consist of a 10-year permission for the construction of a Solar PV Energy Development comprising installation of Solar Photovoltaic (PV) panels on ground mounted frames/support structures within existing field boundaries, underground cabling and ducting, 1 no. customer control building, 1 no. switchgear and transformer building, site perimeter (stock proof) security fence and associated access gates, maintenance track, landscaping and all associated site development works. A temporary construction compound will be provided and vehicular access is via the existing access route from N24 serving the Ballydine 110kv substation to south-west of the site. This application relates to development for the purposes of an acitivity requiring a licence under the Industrial Emissions Directive. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application.
The construction of (i) an extension to loose shed with cubicle and slatted tank and storage area, (ii) soiled water tank and all associated site works
The construction of (i) milking parlour incorporating dairy plant rooms, meal bin, holding yard with crush/drafting yard, underground effluent tank with flow channel (ii) extension to shed to add cubicle shed with underground effluent tank and all assorted site works. Demolition is also required for 3 loose sheds and derelict dwelling
The brief summarizes the pattern across all 173 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20966The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief