Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 115 decisions within 5 km, 3 exact-site or onsite candidate records, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Clare County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Clare County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Clare County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedNo current-dated citation is loaded for Clare County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
To demolish existing shed and barn, construct a new dwelling house and garage, construct a new entrance and modify existing farm entrance, install a new sewerage treatment system along with all associated works
To renovate and extend an existing cottage, demolish an existing haybarn, alter the existing entrance to provide a separate access for the dwelling and farm, setback the existing roadside boundary to improve the sight distance for the existing entrance and install a new wastewater treatment system along with all associated works
For development in the townlands of Crossmore, Derrynageeha, Ballyduneen, Carrowreagh West, Corraige, Knockalough, Crag, Furroor, Boolynamweel, Illaunatoo or Sorrelisland, Boolynaknockaun, Glenmore and Booltiagh. The Development will consist of: 1. A 38kV electrical connection over a total of approximately 11km, from the permitted Crossmore Wind Farm (planning ref: P09/123, as extended under planning ref: 19/388 and altered by P20/824) to the existing 110kV Booltiagh substation. This connection will consist of approximately 10km of overhead line and associated 97 no. wooden polesets (single, double and triple structures with approximate heights between 14-19 metres), and approximately 1km of underground cabling. The cable will travel underground within the wind farm site (in the townlands of Cross More and Derrynageeha), underground on private lands (in the townlands of Boolynamweel, Illaunatoo and Boolynaknockaun) and under the public road prior to entering the Booltiagh substation (in the townlands of Boolynaknockaun and Booltiagh). 2. Roads and access arrangements/works consisting of: a) Creation of new permanent access gate into private lands off the L6180 local road; b) Construction of new access roads to facilitate provision of the grid connection, to be retained for permanent use; and c) Upgrade of the existing public road network for turbine delivery including; I. Junction improvement works at the N68 and L6180; II. Widening along the L6180. 3. The proposed development also incorporates construction of the following elements at the site of the permitted 7-turbine Crossmore Wind Farm (ref: P09/123, as extended by P19/388, and altered by P20/824) which will have a 25 year operational lifespan from the date of commissioning: a) Provision of a permanent 38kV substation north of permitted Turbine 5 in lieu of previously approved substation located south of Turbine 2; b) Redesign of permitted turbine hardstand areas consisting of additional temporary hardstand areas for blade storage; c) Provision of 2 no. temporary construction compounds; d) Proposed upgrade of existing access road and proposed new areas of access road between permitted Turbines no. 5 and no. 6, in lieu of permitted upgrade of existing access road between permitted Turbines no. 2 and no. 5; e) All associated underground cabling between permitted turbines and relocated substation, and; To view remainder of description please view newspaper notice.
To carry out alterations and extension to the existing dwelling and add a storage shed along with all associated works
For (A) the construction of a porch to the rear of the dwelling and (B) the construction of a detached building, incorporating a private garage, open shed, and green house and for PERMISSION to construct an extension to the side of the dwelling, all with associated site works
To construct a new dwelling house, private garage, entrance and sewerage treatment facilities along with all associated works
The brief summarizes the pattern across all 115 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 22720The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief