Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 1,110 decisions within 5 km, 3 exact-site or onsite candidate records, and 91 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
91 structured nearby appeal records.
91 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Extension of permission for planning ref 12/1002: an electrical transmission substation and associated infrastructure and works, within and adjacent to the site of the existing 220/110kV Killonan substation. The development consists of (1) construction of a 220kV Gas Insulated Switchgear (GIS) substation building, of 1,856m2 gross floor area, with a maximum height of approximately 14 metres above ground level, (2) construction of a 110kV GIS substation building of 1,642m2 gross floor area, with a maximum height of approximately 12.5 metres above ground level, (3) construction of associated and ancillary outdoor electrical equipment and other apparatus; construction of three lightning masts of approximately 18.4 metres in height; internal access road, car parking areas, boundary treatment, associated drainage and site development works, (4) associated transfer of circuits from the existing 220/110kV Air Insulated Switchgear (AIS) substation to the proposed GIS substation, (5) construction of six 110kV end masts to facilitate connection of the existing overhead line transmission circuits to the proposed substation equipment by way of underground cable connections. These end masts will replace six existing end masts which are located within the existing ESB Killonan site. Two of the six end masts will be located adjacent to, but outside the western and southern boundaries of the existing substation complex. One of these two end masts will be located in the townland of Coolyhenan, the other will be in the townland of Milltown. The remaining 4 end masts and all other proposed works are located within the existing ESB Killonan substation in the townland of Milltown. The proposed end masts will measure up to a maximum of 21.5metres in height and will be of a similar form, scale and character to those existing and (6) all associated site development works (this application is for a 10 year permission)
Minor modifications to a previously permitted development (Ref. 12/1002). The proposed development comprises the extension of the existing Killonan 220/110 kV Electrical Substation compound by approx. 0.5ha along and adjacent to its existing western boundary. This will facilitate the proposed siting of a previously permitted Line Cable Interface Mast (LCIM) development includes the associated erection of 2.6m high palisade fencing along the extended western boundary of the substation compound and all associated and ancillary development at the existing Killonan 220/110 kV Electrical Substation
The development that will consist of: The installation of solar panels on 2 no. steel frames over each roof of 2 no. existing telecommunication cabins (covering an area of approx. 46 sq.m. and approx. 32 sq.m. respectively, each to a maximum height of 4.5 metres above ground level). Works to consist of all ancillary development works including steel uprights
The existing 30m high telecommunications support structure, with associated panel antenna and link dishes, equipment cabin, and compound enclosed by security fence, and access track previously granted temporary permission under planning ref 11/951. The development will continue to form part of Vodafone Ireland Ltd's existing GSM and 3G Broadband telecommunications network
Construction of dwelling, garage, modify an existing site entrance to create a dual combined entrance, install effluent treatment system including all associated site works
The construction of an extension to an existing dwelling, new septic tank, percolation area and all associated site works
The brief summarizes the pattern across all 1,110 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 237011The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief