Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
16% of nearby decided applications were refused. The site check found 530 decisions within 5 km, 2 exact-site or onsite candidate records, and 27 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Meath County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Meath County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Meath County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
27 structured nearby appeal records.
27 matchedCitations are current-dated and carry policy name, section, page and source URL from the Meath County Council development plan.
1 matchedOpen preview
Open preview
The construction of a bungalow, proprietary waste water treatment system, domestic garage, new entrance and all ancillary site development works. Significant further information/revised plans submitted on this application
The construction of a bungalow, proprietary waste water treatment system, domestic garage, new entrance and all ancillary site development works
The construction of an extension to private dwelling including the demolition of existing conservatory room together with the remodel of the existing layout with connection to all existing services including all ancillary site development works. Significant further information/revised plans submitted on this application
A) Extension to the rear of the existing dwelling house. b) Revised site boundaries from those shown in application NA/160322 (i.e. consistent with those shown in most recent application NA/180303). c)Relocation of the existing wastewater treatment system and percolation area (as approved under application number NA/160322) and d) all ancillary site works
Development will consist of the following: (A) To demolish a habitable dwelling house and to close up and decommission an existing septic tank and soak-pit. (B) Within the same landholding and located circa. 180 metres east of the dwelling to be demolished, propose to construct a replacement single storied dwelling house and a detached domestic garage and to install a new septic tank and percolation area. (C) To make a new entrance onto the public road which will include the removal of an existing front hedge and bank to improve sightlines at the new entrance and also at the adjacent cross roads junction. (D) All ancillary site development works
Extension to the rear of the existing dwellinghouse and all ancillary site works (previous dwelling planning application number NA/160322). Significant further information/revised plans submitted on this application
The brief summarizes the pattern across all 530 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 24427The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief