To construct 3no. additional mushroom growing tunnels, hardstand area and all associated site works at existing mushroom growing facility
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
Downings , Tullow , Co. Carlow
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
13% of nearby decided applications were refused. The preview found 229 nearby planning records within 5 km where a location match is available.
- Matched source
- 2460306
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest planning decisions
Of the relocation of the following: a treatment system and percolation area, 3 no. mushroom growing tunnels and packing room, granted under PL17/305 and planning permission to construct 3 no. additional mushroom growing tunnels and all associated site works
For the retention of a biomass boiler and storage silo facility and all associated works
For the demolition of a wind turbine of 150kw that was erected with planning ref. number 09125 and apply for Planning Permission to erect a 500kw wind turbine, located at the south-east corner of our land, with a hub height of 65 meters and a blade diameter of 44 meters, with underground ducting connecting to existing ESB substation and all associated site works
The development will consist of: Construction of a single storey agricultural shed building and all associated siteworks
To construct a boiler housing unit and Wood Chip Silo and all associated site works
The brief summarizes the pattern across all 229 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 2460306The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief