Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 300 decisions within 5 km, 4 exact-site or onsite candidate records, and 9 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
9 structured nearby appeal records.
9 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
(1) previous change of use of part of an existing dwelling to use as general offices, (2) PERMISSION for a change of use of the remaining dwelling part of the existing dwelling to use as general offices and staff facilities and (3) PERMISSION to extend this existing building to provide additional offices and associated staff facilities and all associated site works
The replacement of a permitted single storey terminal electrical station and a separate single storey electrical switchroom (both previously permitted as part of a solar farm permission by Tipperary County Council under Reg. Ref. 16600359) with 1 no. single storey 20kV substation building on the site of the previously permitted terminal station; repositioning of a permitted storage container, and minor solar panel layout revision adjacent to the proposed substation; repositioning of entrance gate and security fencing at entrance to the solar farm field and provision of new gate in perimeter security fence adjacent to Ballynilard Stream
Alterations to the previously permitted solar farm as follows: a) Replacement of a permitted single storey terminal electrical station and a separate single storey electrical switchroom (permitted as part of a solar farm permission by Tipperary County Council Reg. Ref. 16600359) with a single storey 20kV substation building on the site of the previously permitted terminal electrical station; repositioning of a permitted storage container, and minor solar panel layout revision adjacent to the proposed substation; repositioning of entrance gate and security fencing at entrance to the solar farm field; and provision of new gate in perimeter security fence adjacent to Ballynilard Stream; and b) Permission to increase the operational period of the solar farm from 25 years to 40 years
Demolition of existing entrance and front boundary wall and replace with new set back entrance and front boundary wall and associated site works
The construction of a dwelling house, septic tank and percolation area, entrance and all ancillary site works
1. filling and raising of former quarry for agricultural use, using clean, inert construction and demolition waste, soil and subsoil including all necessary re-seeding and preservation of boundaries and boundary features. 2. crushing of some imported inert construction and demolition waste including permission for heaping and storage of all recycled aggregate. 3. permission is also sought for the sale and transport off site of crushed, recycled aggregate (circular economy) 4. permission for installation of prefabricated structures comprising staff canteen, office and toilet accommodation including the installation of a on-site effluent treatment system and all associated site development works (this development will require a waste licence)
The brief summarizes the pattern across all 300 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2460942The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief