Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
28% of nearby decided applications were refused. The site check found 318 decisions within 5 km, 2 exact-site or onsite candidate records, and 33 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
33 structured nearby appeal records.
33 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Extraction and processing on site, to include washing (with associated closed recycled washing plant and lagoon system), screening and crushing plant; storage; stockpiling and haulage of sand and gravel to service the existing readymix concrete plant operated by Kilsaran on the eastern side of the R108 regional road and permitted under P. Ref. 80/572 & 22/153 (ABP-314881-22); The total extraction proposal extends to an area of c. 6.2 hectares and will be worked (extracted and restored) on a phased basis for a period of 11 years plus 1 year to complete final restoration works (total duration of 12 years); Phased stripping and storage of topsoil and overburden materials for reuse in the restoration works. Restoration of the site will be to a beneficial agricultural after-use; • Access to the site will be through the existing agricultural enterprise site entrance onto the R108 regional road with upgrade of same to consist of setting-back of the existing boundary wall to the north of the site access, and provision for the upgrade of the existing internal access track and sections of a new access track which will include a new weighbridge; and All associated site ancillary works within an overall application area of c. 14.9 hectares. An Environmental Impact Assessment Report (EIAR) has been prepared in respect of this planning application. Significant further information/revised plans submitted on this application
The development will consist of: Extraction and processing on site, to include washing (with associated closed system silt settlement lagoons), screening and crushing; storage; stockpiling and haulage of sand and gravel to principally service the existing readymix concrete plant operated by Kilsaran Concrete on the eastern side of the R108 regional road and permitted under P. Ref. 80/572; The total extraction area extends to an area of c.6.9 hectares and will be worked (extracted and restored) on a phased basis; Phased stripping and storage of topsoil and overburden materials for reuse in the restoration works. Restoration of the site will be to a beneficial agricultural after-use; Access to the site will be through the existing agricultural enterprise site entrance onto the R108 regional road with upgrade of same and provision for the upgrade of the existing internal access track and section of a new access track; All associated site works within an overall application area of c.17 hectares, and all for a period of 9 years plus 1 year to complete restoration works (total duration of 10 years). An Environmental Impact Assessment Report (EIAR) has been prepared in respect of this planning application. Significant further information/revised plans submitted on this application
Partial demolition of existing dwelling, new 2 storey extension with single storey link to existing dwelling, new 2 bay garage with home office in loft, replace existing septic tank with proprietary waste water treatment system, SuDS drainage and all associated site works. Significant further information/revised plans submitted on this application
Planning permission for dwelling house, waste water treatment system and percolation area, new vehicular entrance to site from public road and all associated site works.
An agricultural machinery storage shed and all associated site works. Significant further information/revised plans submitted on this application. Significant further information/revised plans submitted on this application
The refurbishment and reuse of an existing vernacular dwelling house and attached outbuildings extension to same new wastewater treatment system and percolation area to serve dwelling, new entrance gate and access lane and all associated site works. AI Receieved 27/01/2022
The brief summarizes the pattern across all 318 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2461041The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief