A detached commercial building for the processing and storage of firewood and Permission for a new low level wall to the Southern boundary and all associated works
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
Cranemore , Kildavin , Co. Carlow
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
8% of nearby decided applications were refused. The preview found 161 nearby planning records within 5 km where a location match is available.
- Matched source
- 2420
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest planning decisions
To construct external slatted tank, concrete aprons and all associated site works
To construct a slatted cubicle shed, concrete aprons, new agricultural entrance and all associated site works. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and is submitted with the planning application
Retention planning permission is sought for a domestic store and all associated works
(1) construct an extension to the rear and side of existing dwelling & upgrade of on-site sewerage facilities (2) demolish existing storage shed to make way for said extension & (3) construct new domestic garage and all associated site works
Permission for revisions to previously granted planning permission PL17/109, comprising of a revised design of dwelling house with on site effluent disposal system, bored well, new entrance, domestic garage and all associated site works.
The brief summarizes the pattern across all 161 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 2420The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief