Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 197 decisions within 5 km, 3 exact-site or onsite candidate records, and 10 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
10 structured nearby appeal records.
10 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For the installation of 2 new cooling tower units and associated concrete bases at the existing Waste Water Treatment Plant and associated ancillary site works. Upgrade works to the existing watermain consisting of the installation of a new watermain connecting existing water reservoir tank in the Glanbia Milk Processing Facility to the existing pump house including the crossing of the N77 public road and all ancillary site works. Upgrade of the existing effluent line to include the construction of a new effluent line connection from the Glanbia Milk Processing Facility and the existing Waste Water Treatment Plant including a crossing of the N77 public road and all ancillary site works. Installation of services across the N77 public road and all ancillary site works. The milk processing facility holds an industrial emissions licence issued by the Environmental Protection Agency. A Natura Impact Statement has been prepared and accompanies this application
For the proposed installation of two new liquid storage silos for dairy products, relocation of an existing tank from internal to external, construction of a canopy for loading and unloading of raw materials and final product and associated works, construction of a new services pipe bridge between the proposed canopy and the proposed silos, reinstatement of concrete yard and all associated site works. The milk processing plant site holds and industrial emissions license issued by the Environmental Protection Agency
For development at this site. The development will consist of A Packaging Intake Building, A Butter Despatch comprising two butter despatch docks, An extension of the existing roadside boundary wall, Alterations to the existing building elevations, Associated site works. The proposed development will result in improved site safety, operational efficiency and containment of material deliveries and butter despatch. The milk processing plant site holds an industrial emissions licence issued by the Environmental Protection Agency.
For development. The proposed development will consist of: Construction of two anaerobic digesters, one equalization tank to include concrete base, earth embankment and associated works; construction of biogas storage dome with biogas flare, desulfurization unit; construction of membrane and control building with yard slab and link road; construction of ferric chloride storage tank; installation of a new pipeline with underground and overground sections for the purpose of conveying renewable biogas to the Glanbia facility east of the N77 road; realignment of the existing internal road to facilitate vehicle movements; drainage works and all associated site works including landscaping. The dismantling and removal of an existing disused sludge mixing tank; dismantling and removal of an existing biotower. This facility holds an industrial emissions licence issued by the Environmental Protection Agency. A Natura Impact Statement (NIS) will accompany this application
For development which will consist of: An extension to the existing Bio Solids De-watering Building for the installation of new equipment and material storage along with a new external silo and associated concrete bund: a new concrete yard to access the building extension and all associated effluent and storm drainage networks: new security fencing and sliding gate and modifications to the existing entrance: replacement of existing Dissolved Air Flotation (DAF) system with a new DAF System; landscaping and all associated site works. This facility holds an industrial emissions licence issued by the Environmental Protection Agency. The application will be accompanied by a Natura Impact Statement (NIS).
For a two storey extension to their existing Research and Development Facility to accommodate a pilot plant, laboratories, storage, dryer and wet process rooms, associated equipment and roof mounted air handling equipment. Alterations to the existing Research and Development Facility to accommodate the extension that includes an increase in the first floor area, alterations to northern and western elevations and installation of roof mounted air handling equipment. An extension to an existing carpark North of the site. A new carpark South of the site. Associated site works including a pipe bridge, earthworks retaining walls, pedestrian routes, drains and services including car park lighting. The extension and alterations to the existing Research & Development Facility will provide a controlled and hygienic environment for product testing and development. The new car parks north and south of the plant will replace parking spaces (57 no. spaces) removed to facilitate the extension to the Research and Development Facility and will provide an additional 54 no. spaces. The milk processing plant site holds an industrial emissions licence issued by the Environmental Protection Agency
The brief summarizes the pattern across all 197 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 21882The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief