Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 165 decisions within 5 km, 2 exact-site or onsite candidate records, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF 1 NO. BELL MOUTH ENTRANCE WITH ACCESS ROAD SO AS TO FACILITATE ACCESS INTO EXISTING FORESTRY PLANTATION FOR THE REMOVAL OF TIMBER AND ALL ANCILLARY WORKS
CONSTRUCT EXTENSION TO EXISTING DWELLING HOUSE AND UPGRADE EXISTING SEPTIC TANK TO WASTEWATER TREATMENT SYSTEM AND PERCOLATION AREA AND ASSOCIATED SITEWORKS
CONSTRUCT DWELLING HOUSE, DOMESITC GARAGE/FUEL STORE, SEPTIC TANK, TREATMENT SYSTEM AND PERCOLATION AREA AND ALL ANCILLARY SITE WORKS
RETENTION FOR REMOVAL OF TWO MASS CONCRETE CHIMNEYS AND THE MASS CONCRETE FRONT ENTRANCE PORCH AND REPLACEMENT WITH NEW WINDOW.
5 YEAR PLANNING PERMISSION CONSISTING OF THE EXTENSION OF THE EXISTING QUARRY FOR THE EXTRACTION OF SAND AND GRAVEL AND ALL ASSOCIATED SITE WORKS. THE PROPOSED EXTENSION IS ON LANDS TO THE NORTH OF THE EXISTING QUARRY AND THE ADDITIONAL EXTRACTION AREA AMOUNTS TO AN AREA OF APPROX. 2.5 HECTARES. THE APPLICATION IS ACCOMPANIED BY A NATURA IMPACT STATEMENT
Finnegans Sand Limited intends to apply to Mayo County Council for planning permission for development at this site The development will consist of the proposal for recovery and recycling of construction and demolition materials and inert soil and stone within a portion of an extant quarry in a site area of circa 1.6 ha. The proposed development is within the same footprint as Waste Facility Permit No. WFP-MO-22-0064-01 which is due to expire in January 2028. Upon the grant of planning, a separate Waste Facility Permit will be sought from Mayo County Council and an End of Waste Declaration will be submitted to the EPA for this activity. Planning is sought for six years and will include use of existing plant and machinery and all ancillary site works and services
The brief summarizes the pattern across all 165 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22882The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief