Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
16% of nearby decided applications were refused. The site check found 636 decisions within 5 km, 3 exact-site or onsite candidate records, and 214 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Wicklow County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Wicklow County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Wicklow County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
214 structured nearby appeal records.
214 matchedCitations are current-dated and carry policy name, section, page and source URL from the Wicklow County Council development plan.
2 matchedOpen preview
Open preview
Construction of a new single storey industrial unit with ancillary 2 storey office accommodation (Total Floor Area 2310 sq.m) and all associated site development works
Directional sign
Construction of internal estate road and all associated site works
Construction of Biofuel facility comprising of a part 3 storey and part single storey commercial building with a total floor area of 1771m2, covered truck filling / unloading area. Pipe bridge and tank farm storage area. The overall building height is 14 metres with solar panels on the roof. The maximum height of any storage tank is 12 metres and the boiler room chimney is 15 metres. Extension of the existing Kish Business Park access road, footpaths, drainage and water supply to serve the subject site. New internal roads, footpaths, 21 no. car parking spaces, 10 no. cycle parking spaces and parking and circulation areas for 10 no. trucks; 2 no. vehicular entrances, pedestrian access, boundary treatment and landscaping, ESB substation and new underground foul and storm water drainage system for the site including rainwater harvesting, attenuation pond, full retention oil interceptor and associated works. The application site area is 1.6 hectares. An Environment Impact Assessment Report (EIAR) has been prepared and will be submitted to the Planning Authority with the planning application
Single storey 710 sqm industrial unit, comprising of a 236 sqm metal fabrication workshop, and 474 sqm trade sales and display area, plus 272 sqm concrete surfaced yard with security fence to the side of the proposed building, connect into the existing mains sewer and storm water systems, to provide car parking, a 3.5m high sign at the site entrance and all additional site works
Erect a 2,300m2 manufacturing & engineering industrial unit with connecting 440m2 office building along with all associated site development works including storage yard, car parking, signage and connect to the existing services
The brief summarizes the pattern across all 636 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2360464The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief