Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 518 decisions within 5 km, 3 exact-site or onsite candidate records, and 22 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
22 structured nearby appeal records.
22 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To retain and complete the change of use of the first floor and its associated ground floor entrance hall and staircase from light industrial use to office space of unit 5. (Previous planning applications 06/5042 and 10/1745). Full planning permission also sought to retain the existing ground floor toilet facilities, canteen facilities and office space on part of the ground floor of unit 5. Full planning permission also sought to install a lift to facilitate unit 5 and the existing two storey office block. Permission also sought to install a new front door to unit 5 and all ancillary site works. Gross floor space of proposed works: 208 sqm.
For the change of use of an existing 1 storey light industrial unit to a 338.80 sqm. warehouse with ancillary office accommodation & training room unit over 1 floor and mezzanine with alterations to the front & rear elevations. The works will include all associated site works and ancillary services. Gross floor space of proposed works 338.80 sqm.
For a single storey light industrial building sub-divided into 4No. units each with ancillary accommodation and including 45 carparking spaces and all associated site works and services. Gross floor space of proposed works 1380sqm.
1. to retain minor alterations to extension to dwelling house granted under planning Ref No. 15/799. 2. Construction of extension to side and rear of existing house. 3. for stone façade finish to front and side elevations. Gross floor space of proposed works: 59 sqm. Gross floor space of work to be retained: 23.30 sqm
For ground-mounted photovoltaic solar panels with a maximum square metreage of 2,900 m2 distributed over grass areas in combination with associated ancillary works at Tuam WWTP. A Natura Impact Statement is submitted along with the planning application
Of (1) two no. extensions to the rear of the existing house, minor elevation & plan changes from that previously granted under planning ref no. 12/1573. (2)construction of garage/fuel store to the rear of the house. (3) change in location of driveway entrance from that previously granted under planning ref no: 13735 incl. all ancillary site development works. Gross floor space of work to be retained: (House) 190 sqm & (Garage) 31 sqm. Gross floor space of proposed works: (Garage) 35 sqm
The brief summarizes the pattern across all 518 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 211925The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief