Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 868 decisions within 5 km, 1 exact-site or onsite candidate record, and 69 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
69 structured nearby appeal records.
69 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The development consists of the following: - (1) Development of 2 new GAA Pitches to the south west of the existing clubhouse including the provision of new 1200mm high fencing and training floodlights (2) Construction of a new Gym with office and changing facilities (3) Construction of a new workshop and plant storage facility (4) Provision a gravel walkway around the boundary of the entire land holding (5) Provision of a spectator stand to the Existing GAA Pitch 1 (6) Provision of a shelter including a digital score board and a toilet between the Existing GAA Pitch 2 and the Proposed GAA Pitch 4 and Proposed GAA Pitch 5 (7) Retention of the extension of the existing car parking to the east of the clubhouse (8) Retention of a new pedestrian footbridge across the Broadmeadow Stream along with all associated site works
Construction of new part Dormer/part 2 storey pitched roof extension to side (North) elevation, internal alterations to existing dwelling to facilitate the works, provision of vehicular entrance from internal estate road in line with front boundary together with all ancillary site works, landscaping and site drainage
The development will consist of revised elevational treatment to front & side elevations and a proposed new single storey extension to the rear of the existing dwelling with a detached domestic garage. Permission is also sought for the demolition of 2 No. garden sheds to side of existing dwelling with associated site works
The construction of a single-storey extension to the side of the property, amending a window in the existing gable elevation and all associated site works
The construction of a two-storey plus attic-level extension to the side of the property and all associated site works
A proposed new ground floor only extension to the rear of the existing house extending out 1.5m at the side of the existing house. A new door ope in the side of the existing gable wall. A new ground floor only porch to the front of the existing house and all ancillary works
The brief summarizes the pattern across all 868 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 212310The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief