Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 483 decisions within 5 km, 2 exact-site or onsite candidate records, and 20 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
20 structured nearby appeal records.
20 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For the following: (1) Demolition of an existing bungalow (2) Construct a new ESB Substation and (3) Construct mixed use industrial units with office accommodation for industrial, light industrial, storage, warehouse and logistic usage including ancillary siteworks
To make amendments to a previous granted planning Ref No. P21-738 which included (1) Demolition of an existing bungalow (2) Construct a new ESB Substation and (3) Construct mixed use industrial units with office accommodation for industrial, light industrial, storage, warehouse and logistic usage including ancillary siteworks all at Western Business Park, Caherteige and Drumgeely Shannon, Co Clare. The amendments to the previous granted planning include the following: (a) relocating the ESB substation from the eastern elevation of Unit 7 to the western elevation of Unit 6, (b) revising the internal layout and elevation of Unit 6 and raising the height of Unit 6 from 16.4m OD to 18.4m
For the following development on the site, consisting of; construction of a new 47 m2 bunded modular extension including an underground bund, A new external covered solvent storage area and bund, New concrete yard, New access landing, ramp, steps & railings, Removal of an existing LPG tank, and All ancillary site development works and services to facilitate the development including drainage, and utility connections. The proposed development site is controlled by an Industrial Emissions Licence (No. IEL P0020-03) authorised by the Environmental Protection Agency
To construct a commercial 'park and ride' car park facility, associated signage and ancillary site works (previously granted a 3 year permission under planning ref P16-137 which expires 22/5/19).
For change of use of an existing commercial building and yard to a commercial vehicle/container parking depot, maintenance repair workshop, incorporation of a wash bay and Class 1 interceptor and installation of full retention interceptor for parking yard along with all necessary ancillary works
To Retain and Maintain and, Continue to use established, temporary ancillary car parking areas associated with the development and operation of the Westpark Business Campus.
The brief summarizes the pattern across all 483 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 21738The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief