Free preview / €29 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

Tawnaghmore , Co. MayoOpens secure checkout for the €29 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€29 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

Tawnaghmore , Co. Mayo

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

8% of nearby decided applications were refused. The site check found 12 decisions within 5 km, 1 exact-site or onsite candidate record, and 1 structured appeal.

Matched source
221029
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.

Applications tied to the site

Partial coverage

1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.

1 matched

Zoning and settlement

Not yet covered

Current indexed zoning and settlement layers are intersected with the selected site where coverage exists.

Rural-housing policy

Not yet covered

Current section-and-page citations have not yet been loaded for this authority.

Flood, heritage, ecology and archaeology

Not yet covered

Each layer reports its own coverage; missing coverage never appears as a clean result.

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Confirmed coverage

1 structured nearby appeal record.

1 matched

Current policy citations

Not yet covered

Historic extracted references are not presented as current policy; verified citations are still being loaded.

12Nearby applications
1Site-linked candidates
8%Nearby refused
1Structured appeals

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest planning decisions

221029

Five year permission for the development of a temporary access track adjacent to the L52926 local road, required to faciliate the delivery of turbine components to the consented Sheskin Wind Farm (P19/457). Locally sourced gravel will be used to create an access track on private lands adjacent to the L52926 so delivery vehicles can make a right turn from the N59 onto the L52926. The land required for the access track will be reinstated shortly after turbine components have been delivered

Granted0.0 km24 January 2023
20834

10 YEAR PERMISSION TO DEVELOP AN ELECTRICITY SERVICE, ENTAILING THE LAYING OF APPROXIMATELY 10.4 KILOMETERES OF 38KV UNDERGROUND CABLE FROM THE GRANTED SHESKIN WIND FARM TO CONNECT THE WIND FARM TO THE NATIONAL GRID AT THE EXISTING BELLACORICK 110KV ESB STATION. THE PROPOSED GRID CONNECTION WILL BE INSTALLED ALONG EXISTING PRIVATE TRACKS, THE PUBLIC ROADWAY AND A SHORT SECTION OF PRIVATE AGRICULTURAL LAND.

Refused2.1 km19 July 2021
18447

6 year permission to erect a guyed wind monitoring mast, with instruments up to 100m in height

Granted2.2 km10 August 2018
23162

Synchronous condenser/flywheel, located within a fenced compound of c.0.85 ha consisting of: machine building to house equipment including the synchronous condenser, flywheel, lube oil skid, air compressor and pumps. Supporting items of plant; cooling equipment, c.6m high modular containers to house electrical and control equipment, 2 auxilliary transformers and electrical plant including external circuit breaker, HV electrical compound with electrical switchgear and main step-up transformer and new c.200m underground cable grid connection to the Bellacorick 110kv substation; diesel generator, fire water tank, underground oil separator and collection pit, services connections including electrical, water and wastewater and constructed wetland connecting ot Owenmore River; 3 office/welfare buildings and 2 spare parts containers. External lighting poles c. 9m, lightning monopole and Scada communications mast,. 4 fire walls around main step up transformer c. 8m high, 2 fire walls either side of auxilliary transformers c. 5m high, 3 firewalls around cooler for main transformer, 8m high. Ancillary site clearance and developemt works including provision of areas of hardstanding, internal access roads, laydown area, car parking and connection to site services networks. The development will be bounded by one c. 3.6m high palisade fence on the east side and one 5m high palisade fence to the south side. Site access will be by means of a new c. 3.6m high palisade gate and a second 3.6m sliding gate accessed from the Shranakilla Road off the N59. Permission sought is for 10 years. NIS submitted with application.

Granted3.2 km03 August 2023
18274

DECOMMISSIONING AND REMOVAL OF ELECTRICAL PLANT AND ASSOCIATED STRUCTURES AND THE DEMOLITION OF THE EXISTING FENCE ALONG A PORTION OF THE NORTH EASTERN BOUNDARY OF THE EXISTING SUBSTATION, THE EXTENSION OF THE EXISTING SUBSTATION BY 3970sq m TO ACCOMMODATE c. 30m OF OVER HEAD 110kV CONDUCTOR CONNECTING TO AN EXISTING 110 kV BUSBAR AND ASSOCIATED STRUCTURES c. 16m HIGH, INCORPORATING LIGHTENING PROTECTION MEASURES, 1 NO. 38/110kV BUNDED TRANSFORMER, AND ADDITIONAL 38 kV ELECTRICAL EQUIPMENT SUCH AS ARC SUPPRESSION COIL, CABLE CHAIRS/SEALING ENDS, ETC. ALL ANCILLARY WORKS WITHIN THE SITE INCLUDING THE PROVISION OF ADDITIONAL AREAS OF HARD-STANDING, INTERNAL ACCESS-WAYS, ASSOCIATED DRAINAGE WORKS AND ALL WORKS ASSOCIATED WITH REMOVAL, RELOCATION, REPLACEMENT AND INSTALLATION OF UNDERGROUND CABLES, ELECTRICAL PLANT AND SWITCHGEAR ON THE SITE, AND A 2.6m HIGH PALISADE PERIMETER FENCE WITH A DEDICATED ACCESS GATE

Granted3.3 km12 June 2018
18190

A c.3 MW CAPACITY BATTERY STORAGE FACILITY AND WILL - SUBJECT TO DETAILED DESIGN, COMMERICAL AND TECHNICAL CONSIDERATIONS INCLUDE: 2 NO. BATTERY STORAGE CONTAINERS (UP TO 16.6m X 2.9M X 3.7M HIGH) A SINGLE-STOREY ELECTRICAL CONTROL ROOM (c.77sqm), ANCILLARY ELECTRICAL PLANT INCLUDING 5 NO. TRANSFORMERS, INVERTERS AND OTHER CONTAINERISED PLANT, A c.15.5M HIGH LIGHTNING MAST AND c.18m HIGH SCADA COMMUNICATIONS MAST, c.2.6m HIGH BOUNDARY FENCE AND ACCESS GATE, c.100m LONG ACCESS ROAD CONNECTING WITH THE EXISTING SUBSTATION ACCESS ROAD AND ANCILLARY SITE WORKS INCLUDING THE INSTALLATON OF SITE SERVICES

Granted3.3 km14 May 2018

The brief summarizes the pattern across all 12 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€29 incl. VAT once-off PDF, no account required