Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 347 decisions within 5 km, 3 exact-site or onsite candidate records, and 24 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Meath County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Meath County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Meath County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
24 structured nearby appeal records.
24 matchedCitations are current-dated and carry policy name, section, page and source URL from the Meath County Council development plan.
1 matchedOpen preview
Open preview
The application is for a 10 year permission. The development will consist of: a solar farm with an export capacity of approximately 3MW comprising photovoltaic panels on ground mounted frames, a single-storey ESB MV Sub-Station / switch room building, installation of 3 No. transformers, ducting & underground electrical cabling, perimeter fencing, pole mounted CCTV cameras, upgrading of existing vehicle entrance, provision of internal access track and all associated ancillary works and services
A solar farm with an export capacity of approximately 3MW comprising photovoltic panels on ground mounted frames, a single-storey ESB MV Sub-Station/switch room building, installation of 3 No. transformers, ducting & underground electrical cabling, perimeter fencing, pole mounted CCTV cameras, upgrading of existing vehicle entrance, provision of internal access track and all associated ancillary works and services
New single storey storage unit to allow storage of classic/vintage vehicles with associated site works
1) construct a single storey domestic extension to the northern gable side of existing dwelling house, and 2) all associated site services.
The construction of a single-story detached dwelling & single-storey domestic garage to the rear, with a proposed Secondary Treatment System and soil polishing filter also modifications to the existing site entrance onto the public road and all associated site works and landscaping
The development will consist of the construction of a single storey dwelling, installation of a wastewater treatment system and percolation area and form new vehicular entrance with piers from public road
The brief summarizes the pattern across all 347 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record LB180570The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief