Executive snapshot
16% of nearby decided applications were refused. The site check found 370 decisions within 5 km, 2 exact-site or onsite candidate records, and 15 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
15 structured nearby appeal records.
15 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Planning permission to construct a two storey dwelling house, domestic garage, new entrance and to install a sewage treatment system with percolation area together with all works ancillary to the overall development on site
A storey & a half type dwelling house, domestic garage, septic tank & percolation area, to upgrade existing entrance onto public road & all associated site works
The development will consist of a detached two storey dwelling, detached domestic garage, wastewater treatment system, site entrance and all associated site works. Significant Further Information/Revised plans submitted on this application
The recontouring of agricultural land and associated site works using imported clean inert soil and stones within a farm holding of 3.821 hectares within the townland of Milltown (plus the additional access roadway serving the development of.553 hectares in the townland of Foxtown) for the consequential benefit to agriculture. A 5 year planning permission is requested and during this period 95,619 tonnes of inert soil and stones will be imported for the purposes of land reclamation. Significant further information/revised plans submitted on this application
EXTENSION OF DURATION OF PLANNING PERMISSION TA181083 - the recontouring of agricultural land and associated site works using imported clean inert soil and stones within a farm holding of 3.821 hectares within the townland of Milltown (plus the additional access roadway serving the development of 0.553 hectares in the townland of Foxtown) for the consequential benefit to agriculture. A 5 year planning permission is requested and during this period 95,619 tonnes of inert soil and stones will be imported for the purposes of land reclamation
Erection of fully serviced 2 storey dwelling with detached domestic garage, new site entrance, wastewater treatment system, percolation area and all ancillary site works
The brief summarizes the pattern across all 370 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record TA201598The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief