Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 256 decisions within 5 km, 3 exact-site or onsite candidate records, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Monaghan County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Monaghan County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Monaghan County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedNo current-dated citation is loaded for Monaghan County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Permission to construct a free range laying hen house with attached egg/equipment stores and manure elevator, associated underground washings storage tank, concrete aprons, meal bins and all associated site works. Significant Further Information relates to a development which is for the purposes of an activity requiring a Licence under part IV of the Environmental Protection Agency Acts 1994 to 2013. And Environmental Impact Assessment Report (E.I.A.R.) and a Site Specific Flood Risk Assessment will be submitted.
Permission to construct 1 no. free range poultry house together with all ancillary structures (to include meal bin(s), and soiled water tank(s)) and ancillary site works (to include a new/upgraded site entrance) associated with the above development. An Environmental Impact Assessment Report (E.I.A.R.) will be submitted with this planning application. Significant further information relates to revised drawing (EIAR revised), updated site layout, response to storm water attenuation and flood risk.
Permission to construct 1 no. two storey dwelling, alterations to existing entrance, provision of mechanical effluent treatment system with associated percolation area and all ancillary site works
Retention planning permission for alterations to the site boundary, design and location of the constructed free range laying hen house with attached store, underground washings collection tank, associated concrete aprons, meal bin etc. previously granted under permission 08/676
Permission to construct a Free Range Laying Hen House with attached egg/equipment stores and manure elevator, associated underground washings storage tank, concrete aprons, meal bins and all associated site works to include site access lane and site entrance
Permission to construct a single storey agricultural machinery storage shed in existing yard together with all ancillary site works
The brief summarizes the pattern across all 256 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 17414The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief