Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 823 decisions within 5 km, 3 exact-site or onsite candidate records, and 48 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
48 structured nearby appeal records.
48 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The retention and completion of the importation of soil for the purposes of land improvements at Park, Tinryland, Co. Carlow
Of 14/141 - for retention for road boundary and entrance with security gates, internal road network, parking facilities, tele sales portable buildings, maintenance portable buildings, canteen portable buildings and training area portable buildings, front extensions, side extensions, rear extensions, first floor extensions and ancillary plant services to existing processing unit, storage facility, bore well, proprietary effluent treatment system and ancillary works relocation ESB sub station and ancillary services. permission sought for storage area unit (dry store and fridge/freeze areas) etc. site development works, construction of internal road network and parking facilities, footpaths, connection and installation of telecommunications, electricity supply, the erection of street/yard lighting, the erection of site boundaries/sound barriers landscaping and ancillary services
Retention Permission for the as constructed storage / collection area extension to south elevation of permitted commercial unit. Planning permission is sought for the construction of (a) extension consisting of a covered loading area to the north elevation of existing commercial unit, (b) extension consisting of covered loading area to the east elevation existing commercial unit (c) all associated site development works
For a change of use of existing agricultural building of 1820m2 to light industrial, and all ancillary site works
To construct an agricultural storage shed of 846m2 internal floor area, associated external concrete apron of 337m2 in area and all associated ancillary site works
48no. residential units (43no.- three bed dwellings, 2no.- four bed dwellings, & 3no.- two bed dwellings), a Childcare Facility (of 319sq.m) and all associated car parking, play areas, landscaping, and all associated site works to include a construction access from the partially complete Carlow Inner Relief Road direct to the proposed site. The subject site has a gross area of 2.739ha and is located at Mortarstown, Carlow, Co. Carlow with proposed access from the partially completed Carlow Inner Relief Road and through the practically complete Cluain Bui residential development.
The brief summarizes the pattern across all 823 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1780The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief