Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 322 decisions within 5 km, 1 exact-site or onsite candidate record, and 12 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
12 structured nearby appeal records.
12 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of 39 No. new dwellings to include; 25 No. Terraced two storey houses (2 & 3 beds), 4 No. Semi-Detached bungalow houses (2 beds) and 10 No. Semi-detached two storey houses (2 & 3 beds); with the provision of rear access into terraced houses for bin storage, and associated parking; together with the completion of all previously granted landscaped areas, roads, footpaths and site development works associated with the previously granted development under PL Reg.No. 03/430 (PL01.206855).
The development will consist/consists of: 1. A new above-ground, treated water service tank with a storage capacity of 608m3 with an overall height of 6.1m (5.0m without safety railings) including: a. Concrete tank; b. Dual compartment; c. Connection pipework; d. Scour and overflow pipework; e. Handrailing and access staircase. 2. A new weather-proof enclosure (3.8m x 3.0m x 3.0m) to house new chlorine dosing system and associated dosing chamber. 3. 16 no. solar PV panels to be mounted on the new service reservoir roof slab (static & south-east facing); 4. Ancillary works, including: a. Associated ground works; b. Footpaths and vehicle turning area; c. Below-ground dechlorination chamber; d. Mechanical and electrical service connections; e. Modifications to the existing electrical control system to support new works; f. Extension to the existing 2.4m high fence around the existing storage site, to incorporate the expanded site; g. Upgrade of existing entrance gate to 7m; 5. Associated temporary works including temporary compound area for the construction period; 6. Associated works including landscaping and biodiversity net gain. A Natura Impact Statement has been prepared in respect of this planning application.
The construction of a Dormer Style Dwelling, septic tank & percolation area, connection to mains water supply, splayed entrance and all associated site development works
For a single storey extension to the rear of the existing dwelling and all associated site works.
A single storey extension, with zinc clad dormer, to the rear of existing house. Also for the installation of external insulation with a rendered finish to the existing dwelling house and the modification of the existing road entrance to achieve road sightlines, and all associated site works
Permission for alterations to our existing Northern boundary to include partial removal of existing wall, the installation of a sliding gate, steel railings and all associated site works
The brief summarizes the pattern across all 322 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 18111The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief