Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
21% of nearby decided applications were refused. The site check found 350 decisions within 5 km, 2 exact-site or onsite candidate records, and 26 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Kildare County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Kildare County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Kildare County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
26 structured nearby appeal records.
26 matchedCitations are current-dated and carry policy name, section, page and source URL from the Kildare County Council development plan.
1 matchedOpen preview
Open preview
A temporary (27 years) ground mounted solar photovoltaic (PV) farm to generate renewable electricity on a 13.6 hectare (ha) site, comprising access gate, security fencing, solar arrays and racking system, electricity substations, electrical control cabinets, grid connection building, energy storage area, energy storage containers, temporary construction compound, CCTV, cabling, hardstanding, new access track, and ecologically beneficial landscape works, (ITM Grid Reference E 680018 N 738927)
To amend application 18/94 at Ovidstown, Ballyvoneen, Enfield, Co. Kildare. The development will consist of a ground mounted solar photovoltaic (PV) farm to generate renewable electricity on a 13.6ha site and to extend the consent to 35 years, which comprises an access gate, security fencing, solar arrays and racking system, 2 no. electricity substations, grid connection building, temporary construction compound, CCTV cabling, hardstanding, new access track and ecologically beneficial landscape works
A 10 year permission for development on lands which will consist of an extension to the solar PV farm granted permission under Register Reference 16/1265 comprising the construction of approximately 25,300 No. photovoltaic panels on ground mounted frames within a site area of 11.50 hectares and associated ancillary development including 4 No. transformer stations, 4 No. auxiliary transformer stations, 4 No. inverters, 1 No. CCTV security camera mounted on 4 metre high pole, perimeter security fencing (2 metres high) and internal access tracks
(a) Erection of bungalow type dwelling; (b) Erection of garage/fuel store for domestic use; (c) Installation of septic tank and percolation area and all associated siteworks
Alteration and relocation of vehicle entrance as granted under previous planning grant 04/1576
A new single storey dwelling, new recessed entrance, new waste water treatment system and all associated site development works
The brief summarizes the pattern across all 350 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 1894The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief