Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 288 decisions within 5 km, 1 exact-site or onsite candidate record, and 18 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
18 structured nearby appeal records.
18 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for development consisting of the following recreational facilities: Part A. Landside installations details of which are outlined below: 1. 2 No. marquees for use as a reception and wet suit distribution, measuring 9m X 9m X 6.6m high and 21m X 15m X 7.8M high; 2. 1 No. 9m X 9m X 3.8m high disabled changing marquee; 3. 1 No. 9m X 9m X 4.7m high safety briefing marquee; 4. 9 No. 12m X 6m X 3.3m high changing marquees; 5. 3 No. 12m X 15M X 5m high marquees for use as a customer observation area, a dining area and a gift shop; 6. 1 No. 4m X 8m X 3.7m high café marquee; 7. 2 No. 3m X 6m X 3m high prefabricated office buildings; 8. Outdoor showers 5m X 6m; 9. Realignment of existing fencing. All the marquees will be coloured white. The proposed development includes all ancillary and enabling site works. The changing rooms and coffee shop will be connected by gravity to existing public sewerage. Part B. Waterside Installations, details of which are outlined below: 1. Main waterpark consisting of inflatable platforms, slides and climbing walls with overall dimensions of 35m X 40m X 8m high; 2. Inflatable junior waterpark measuring 8m X 15m X 5.2 high; 3. No. 1 inflatable water slide measuring 15m X12m X12m high; 4. No. 1 inflatable water slide measuring 31m x 22m x 16m high; 5. No. 1 inflatable water slide measuring 20m X 8m X 13m high; 6. No. 1 inflatable water slide measuring 32m X 16m X 13m high; 7. 50 No. cylindrical shaped inflatable safety booms 4m by.4m diameter. All of the above installations are inflatable PVC structures which are permanently fixed to the lake bed using ropes and anchors. Proposed Operation Periods: It is intended that the overall facility will be operational annually between the 15th March and the 15th of October. The facility will operate during daylight hours only and will not operate past 21:00 hours on any day (a Natura Impact Statement (NIS) will be submitted to the Planning Authority with the planning application) at
Permission for the construction of a new two storey dwelling (280 sqm) and associated ancillary works to facilitate the development including site development works, parking, drainage, foul connection to the mains drainage and landscaping at
Permission for the construction of a single new dwelling including a new connection to the public mains, all associated landscaping and earthworks and all associated drainage at
To demolish semi derelict dwelling and construct replacement part two storey and part single storey dwelling, domestic garage and connect to existing public sewer and water services on site, associated site development works and services at
Permission to (A) construct a development access road incorporating entrance/exit onto the public road, ancillary landscaping and footpaths along with connection to public services and sewers including all associated site development works and B) Construct 5 no. detached dwelling houses and garages and ancillary works, external stores and services together with associated site works at
Permission to construct a detached dwelling house and garage on site no. 5 (Phase 2). (Note: development access entrance/exit onto the public road, ancillary landscaping and footpaths along with connection to public services and sewers including all associated site development works previously granted under PD/21/233) at
The brief summarizes the pattern across all 288 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2262The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief