The construction of a dormer style extension to the rear elevation of my existing dwelling, a domestic garage, new entrance, secondary treatment system & soil polishing filter, connection to services, and all associated site works
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
Shangarry , Myshall , Co. Carlow.
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
5% of nearby decided applications were refused. The preview found 165 nearby planning records within 5 km where a location match is available.
- Matched source
- 2360097
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest planning decisions
To construct a single storey dwelling, domestic garage, secondary waste water treatment system, soil polishing filter and all associated site works
For the construction of 3 No. 10m long x 8m wide sludge drying reed beds and associated site works constructed within the boundary of the existing Myshall Wastewater Treatment Plant, Myshall
Permission for the construction of a 1.5 storey dormer dwelling with detached garage with treatment system, private bore well, new vehicle entrance, landscaping, boundary treatments and all associated site, landscaping and other works to facilitate the development
The construction of a One & a Half Storey Style Dwelling, detached domestic garage, wastewater treatment system, bored well, splayed entrance and all associated site development works
Works completed to proposed car parking area and permission to complete proposed car park, together with all associated site works
The brief summarizes the pattern across all 165 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 2360097The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief