Executive snapshot
11% of nearby decided applications were refused. The site check found 230 decisions within 5 km, 1 exact-site or onsite candidate record, and 10 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
10 structured nearby appeal records.
10 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To further develop the existing quarry and all associated site works. The Proposed Development being applied for under this planning application includes for the continuance of quarrying operations within the permitted extraction area to a finished floor level of 40 metres above ordnance datum (mAOD). The Proposed Development also includes for the continuance of operation of a concrete batching plant permitted under ABP PL 07.117549 (Pl. Ref: 99/1449). The extraction will take place within the existing quarry site boundary and permitted area. The proposed development comprises: • The continued extraction of limestone rock from an area measuring approximately 31 hectares to a finished floor level of 40 mAOD • Aggregate product stockpiles • The continued operation of the on-site concrete batching plant (permitted under planning permission Pl. Ref: 99/1449 and ABP PPL07.117549) • Earthen berm construction along the extraction boundary • Phased restoration of the site • The proposed development will utilise the existing quarry infrastructure including internal roads, site office, weighbridge, wheelwash, refuelling area, welfare facilities and other ancillaries. The development will include the use of conventional drilling and blasting techniques and the use of mobile crushing and screening plant. Permission is sought for a period of 27 years. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared and will accompany the planning application
For the erection and operation of a semi-mobile asphalt/macadam mixing plant on C.0.3 hectares at Kilchreest Quarry. Previous application 15/359.
For a period of 25 years for the continued operation and expansion of an existing quarry at this site (site area 12.66 Hectares) for extraction of limestone rock. The proposed development will increase the extraction area to a total of 10.565 hectares (additional volume to be extracted = 1.33 million m³ approximately) and will include the crushing, screening/processing of rock from the site using mobile plant. The development will include the removal of all existing temporary buildings from the site and replacement with permanent structures including the following: site office 104 m², weigh bridge office 16 m², maintenance shed 483 m². Other works will include the installation of a fuel tank including refueling pad and petrol interceptor, construction of carpark/ lorry parking, installation of signage, street lighting and fencing. The site perimeter will include landscaped soil berms to screen the site. On completion of extraction the site will be restored to a natural habitat. An Environmental Impact Assessment Report (EIAR) and screening for an Appropriate Assessment has been prepared in respect of this planning application & will be submitted to the planning authority with the planning application. Gross floor space of proposed works: 603.00 sqm
For construction of a new Dwelling House, Domestic Garage, Sewage Treatment System and all Associated Site Development Works. Gross floor space of proposed works: 158.4 sqm (house), 58.7 sqm (garage)
To construct an extension to the rear of a dwellinghouse including all associated works & services, & construct a new septic tank with percolation
For the construction of a new dwelling house, domestic garage, sewage treatment system and all associated site development works. Gross floor space of proposed works; 227.6sqm & 43.1sqm
The brief summarizes the pattern across all 230 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2560440The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief