Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
18% of nearby decided applications were refused. The site check found 287 decisions within 5 km, 3 exact-site or onsite candidate records, and 8 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
8 structured nearby appeal records.
8 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for proposed construction of a new 1410m² light industrial/ storage warehouse building, new vehicular entrance, access road and footpaths, new foul sewer connection and pumping station, water main connection, surface water pipework and soakage trenches, site boundary treatments, landscaping including riverside amenity planting and picnic area, seating and walkway and associated site development works. The application is accompanied by a Stage 2 Appropriate Assessment (Natura Impact Statement). *Significant Further Information Received on 15/04/2026*
Permission for an access road and associated site development works to serve lands zoned as Employment Uses
Retention permission for a front bay window, increase in size of front porch, alterations to the external facade, increase in height of front entrance piers/wing walls and associated site development works
Permission for proposed welfare facilities upgrades at Tallanstown Wastewater Treatment Plant (WWTP). The application is made under Section 34 of the Planning and Development Regulations 2000 (as amended). The proposed development will consist of: • 1 no. prefabricated steel container measuring 10ft (3.048m) in length x 10ft (3.048m) x 2.7m in height. The unit will be fitted out with welfare facilities including toilet and shower. • The unit will be installed on a reinforced concrete base complete with perimeter footpaths. • 2 no. 100mm ducts will be installed between the new unit and the existing structure to allow connection of water and electrical services. • 150mm wastewater connection from the new unit to a nearby manhole. • All associated ancillary site development works above and below ground
The development will comprise of the following: Construction of new training areas on lands adjacent to the existing football pitch. Erection of 6 no. 18 metre high floodlighting columns around proposed new adult training area. Provision of 2 metre wide walking track around existing pitch and proposed training areas with associated pedestrian lighting. Erection of 12 metre high ball stops behind goal posts on proposed Adult Training Pitch. New 2.4m high wiremesh fence adjacent to River Glyde. All associated site development works including diversion of 10kv ESB overhead power lines and incorporating a pedestrian gate into the existing front vehicular entrance gate. Erection of 12 metre high ball stops behind goal posts on existing pitch. Replacement of existing floodlighting columns on existing football pitch with 6 No. 18 metre high floodlighting columns.
Retention Permission that will consist of (1) a single storey garage structure to the side/rear garden, (2) the conversion of a single storey garage structure to habitable living space to the front/side and Planning Permission for the construction of (1) a new single storey dormer extension to the front/side, with velux rooflights to the south at roof level, a side gable end window to the east at dormer level, and a flat roof dormer structure to the north elevation at roof level, (2) a new gable end window serving an existing bedroom at dormer attic level to the side/west
The brief summarizes the pattern across all 287 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2560283The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief