Free preview / €29 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

Lands within the townlands of Lumcloon and Falsk , Gallen , Co. OffalyOpens secure checkout for the €29 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€29 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

Lands within the townlands of Lumcloon and Falsk , Gallen , Co. Offaly

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

18% of nearby decided applications were refused. The site check found 91 decisions within 5 km, 3 exact-site or onsite candidate records, and 5 structured appeals.

Matched source
2360071
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.

Applications tied to the site

Partial coverage

3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.

3 matched

Zoning and settlement

Not yet covered

Current indexed zoning and settlement layers are intersected with the selected site where coverage exists.

Rural-housing policy

Not yet covered

Current section-and-page citations have not yet been loaded for this authority.

Flood, heritage, ecology and archaeology

Not yet covered

Each layer reports its own coverage; missing coverage never appears as a clean result.

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Confirmed coverage

5 structured nearby appeal records.

5 matched

Current policy citations

Not yet covered

Historic extracted references are not presented as current policy; verified citations are still being loaded.

91Nearby applications
3Site-linked candidates
18%Nearby refused
5Structured appeals

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest planning decisions

2360071

The installation of a solar photovoltaic (PV) farm, including a Battery Energy Storage System (BESS) consisting of 48no. units and provision of a bridge crossing the Silver River, on 87.96Ha./217.37 acres of lands comprising 18no. agricultural fields on two separate land parcels within the townlands of Lumcloon and Falsk, Gallen Co. Offaly (E: 613500; N: 720000 – centre of site). The solar farm will consist of a series solar photovoltaic (PV) panels mounted on steel support structures to a height not greater than 3.00m. Development ancillary to the siting of solar PV panels includes 19no. transformers; pole-mounted CCTV cameras; underground cabling; deer fenceline measuring 2.00m high; a proposed 5.00m wide graded track between an existing site entrance and BESS; internal access tracks; widening of 2no. existing field entrances and all associated development. Two temporary compounds, measuring 5250sqm approx. in overall area, will be established during the construction phase of the solar farm. The planning permission will have a duration of 10-years, with a subsequent operational lifetime of 40- years, after which it will be decommissioned with all associated lands returned to their original use excluding the Silver River bridge crossing, which shall be retained. A Natura Impact Statement (NIS) has been prepared and submitted in support of this planning application.

Granted0.0 km20 June 2024
1955

ALTERATIONS TO DEVELOPMENT OF AN ENERGY STORAGE FACILITY DESIGNED TO PROVIDE 100MW OF SYSTEM SUPPORT SERVICES TO THE ELECTRICITY GRID AT LUMCLOON, CLOGHAN, CO. OFFALY IN LIEU OF THAT GRANTED UNDER PLANNING PERMISSION PL2/17/194. PROPOSED ALTERATIONS CONSIST OF; (I) PROVISION OF OPEN AREA BATTERY ENERGY STORAGE SYSTEM (BESS) COMPOUND (AREA OF 6,200 SQM) CONTAINING BATTERY AND CONTROL SYSTEM ENCLOSURES IN LIEU OF THE APPROVED SINGLE STOREY MAIN BUILDING (FLOOR AREA OF 4,536 SQM), (II) ALTERATIONS TO THE APPROVED SWITCHYARD CONTAINING THE PROPOSED 110kV SUBSTATION WHICH WILL INCLUDE (A) CONNECTION TO THE EXISTING ELECTRICITY NETWORK IN LIEU OF THAT APPROVED, (B) INCREASE IN THE SIZE OF THE CONTROL BUILDING (FLOOR AREA 375 SQM) IN LIEU OF THAT APPROVED (FLOOR AREA 200 SQM), AND (C) PROVISION OF A DIESEL GENERATOR AND TRANSFORMER ADJACENT TO THE CONTROL BUILDING, (III) INCREASE IN SIZE (630 SQM), LOCATION AND INTERNAL LAYOUT OF SWITCHGEAR BUILDING IN LIEU OF THAT APPROVED (100SQM), AND (IV) PROVISION OF 110kV TRANSFORMER IN LIEU OF MV SUBSTATION (100 SQM), AND (V) AND ALL ASSOCIATED SITE WORKS

Granted0.4 km04 April 2019
20444

THE CONSTRUCTION OF A 33KV SUBSTATION AND SUBSTATION COMPOUND WITH ASSOCIATED ELECTRICAL INFRASTRUCTURE, INCLUDING TRANSFORMER, AND GRID CONNECTION INTO THE PERMITTED DERRYCARNEY 110KV SUBSTATION

Granted0.4 km12 November 2020
2360111

An extension to the existing battery energy storage system (BESS) facility (consented under Planning Ref 19/55) the proposed development includes the construction of the following: (i) Open area battery energy storage system (BESS) on lands adjoining the existing BESS facility to the east and south, containing a total of 112 modular battery containers and medium voltage power stations (MVPS). The proposed development will utilise the existing customer (IPP) building and electrical infrastructure to connect to the grid via the 110kV Derrycarney transmission substation, which adjoins the BESS facility, (ii) Access to the site is proposed through an upgraded existing entrance onto the R357 regional road, (iii) All civil engineering works, drainage, internal roads, landscaping, lighting and security fencing.

Granted0.5 km06 February 2024
2460485

The proposed development includes the construction of the following: (i) two new independent power provider (IPP) buildings, (ii) two new electrical transformers, (iii) additional air insulated switchgear (AIS) including four new 110kV bays, (v) connection to the grid via the existing 110kV Derrycarney substation, (vi) access to the site is proposed through an upgraded existing entrance onto the R357 regional road consented under planning reference 23/60111 and through the existing Derrycarney 110kV Substation entrance, (vii) all civil engineering works, drainage, internal roads, landscaping, lighting, temporary construction compound and security fencing.

Granted0.6 km06 February 2025
18501

A NEW STOREY AND HALF DWELLING HOUSE, DOMESTIC GARAGE, NEW SITE ENTRANCE, SEPTIC TANK AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS

Granted0.7 km19 February 2019

The brief summarizes the pattern across all 91 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€29 incl. VAT once-off PDF, no account required