Applications tied to the site
Partial coverage11 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
11 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 4,180 decisions within 5 km, 11 exact-site or onsite candidate records, and 1592 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
11 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
11 matched1 of 2 layers are loaded for South Dublin County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for South Dublin County Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for South Dublin County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1592 structured nearby appeal records.
1,592 matchedCitations are current-dated and carry policy name, section, page and source URL from the South Dublin County Council development plan.
1 matchedOpen preview
Open preview
Amendments to a previously consented natural gas combined heat and power system and associated infrastructure (Ref. SD21A/0013).
Installation and operation of a natural gas combined heat and power system and the associated infrastructure.
Construction of a new two storey extension adjacent to the existing Pharmacy Department located on the east side of the campus to provide a new Aseptic Pharmacy Unit incorporating laboratory areas; support rooms and first floor plantroom; external stairway; new exit door from the Pharmacy corridor to the adjacent service yard; new exit door from the delivery bay area to the hospital delivery yard and associated site and landscaping works.
Construction of 11 metre high warehouse extension to rear of existing 7 metre high warehouse building.
Single storey first floor extension to the existing Intensive Care Unit (ICU) consisting of twelve isolation bedrooms, associated ancillary spaces, public waiting and overnight areas and staff areas. The proposed will be located on the roof of the existing ground floor outpatients department (existing roof finishes to be removed), connecting to the existing ICU at two locations, to an existing circulation route in one location and to the existing hospital street at one location. There will be no second floor accommodation with the exception of open air plant, screened plant and associated services with access for maintenance staff.
Construct a single storey extension to the rear of the existing warehouse unit including alterations to the existing to accommodate same; All ancillary site works and services.
The brief summarizes the pattern across all 4,180 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record SD21A/0013The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief