Construction of a new two storey extension adjacent to the existing Pharmacy Department located on the east side of the campus to provide a new Aseptic Pharmacy Unit incorporating laboratory areas; support rooms and first floor plantroom; external stairway; new exit door from the Pharmacy corridor to the adjacent service yard; new exit door from the delivery bay area to the hospital delivery yard and associated site and landscaping works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Tallaght University Hospital, Belgard Square North, Tallaght, Dublin 24
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 4,098 nearby planning records within 5 km where a location match is available.
- Matched source
- SD21A/0014
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Amendments to a previously consented natural gas combined heat and power system and associated infrastructure (Ref. SD21A/0013).
Installation and operation of a natural gas combined heat and power system and the associated infrastructure.
Single storey first floor extension to the existing Intensive Care Unit (ICU) consisting of twelve isolation bedrooms, associated ancillary spaces, public waiting and overnight areas and staff areas. The proposed will be located on the roof of the existing ground floor outpatients department (existing roof finishes to be removed), connecting to the existing ICU at two locations, to an existing circulation route in one location and to the existing hospital street at one location. There will be no second floor accommodation with the exception of open air plant, screened plant and associated services with access for maintenance staff.
The construction of a new entrance lobby and concourse of total 250sq.m. additional floor area and 6m in height, including new information desk, informal seating area and display facilities. The proposal includes: (a) modifications to existing main entrance external wall and roof to create continuous 6m high new concourse extending from new entrance doors into the existing 4-storey high Atrium; (b) demolitions including removal of existing entrance canopy (20x7m) and removal of entire existing linear canopy (c.220m length) over the pedestrian walk way at road frontage; (c) associated external works including landscaping works, drainage and new paving; (d) new sign fixed above new entrance lobby doors.
Construction of a new car park to provide 85 parking spaces, controlled taxi-rank, covered bicycle parking zone, new covered walkway located adjacent to the main hospital entrance together with alterations to the existing road, footpath, retaining wall & car park to provide an additional 5 disabled use bays including all associated site works.
Source match
Matched from public planning record SD21A/0014The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report