Applications tied to the site
Partial coverage23 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
23 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 4,659 decisions within 5 km, 23 exact-site or onsite candidate records, and 1774 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
23 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
23 matched1 of 2 layers are loaded for South Dublin County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for South Dublin County Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for South Dublin County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1774 structured nearby appeal records.
1,774 matchedCitations are current-dated and carry policy name, section, page and source URL from the South Dublin County Council development plan.
1 matchedOpen preview
Open preview
Sliding steel entrance gate to the main entrance; partial demolition of a section of existing boundary wall; construction of new site entrance piers and the extension of the existing perimeter railings to meet the new piers; 2 new bicycle shelters and all associated site development works.
Works to the existing roof including installation of 173sq.m of solar pv panels; the erection of a new guardrail on the existing parapet to the perimeter of the roof; alteration to a portion of the existing roof from a pitched roof to a flat roof, installation of roof access hatches and all associated site development works.
The development consists the installation of 2no. new water tanks and an associated enclosure to the north of the existing office building, the relocation of a previously granted bicycle shelter under planning reference SD21A/0123, from the east of the site to the south-west, and all associated site works at PM Group, Kearney House, Belgard Square, Dublin, D24 XFW2.
New external signage fixed at high level to the south elevation; new 2,100mm high totem/banner directory sign at the main entrance to the east of the existing building and associated site works.
The development will consist of the proposed change of use of the two storey warehouse with ancillary offices to a new place of worship with ancillary meeting and other spaces at ground and first floor level (gross floor area - 1,000sqm). This will be facilitated by: minor internal alterations and reconfigurations that will include the creation of a new mezzanine floor above the first floor level to enable access to plant only; new lift; and creation of a stage and ceremonial space at ground floor. external elevation changes to the north and east elevation of this commercial unit that will include the replacement of the warehouse shutter doors with new cladding and door to the north elevation, and alterations to the existing door on the eastern elevation. new signage (3.59sqm) on the corner elevation above the main entrance to the building. The proposed development will be served by 20 no. car parking spaces that will include the integrating of two existing spaces to create a disabled space with vehicular and pedestrian access via the existing entrances off Belgard Square North and Belgard Square East that will continue to serve the rest of this mixed use commercial development.
Renovation and modifications to the original building including a change of use to office, training and distribution centre; proposed changes to the existing internal layout; internal fire stair location moved; extended mezzanine area, additional new toilets; external windows and modifications to the roller door on the rear elevation; new signage to the front elevation and all ancillary works.
The brief summarizes the pattern across all 4,659 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record SD21A/0123The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief