Applications tied to the site
Partial coverage14 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
14 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 4,551 decisions within 5 km, 14 exact-site or onsite candidate records, and 1725 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
14 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
14 matched1 of 2 layers are loaded for South Dublin County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for South Dublin County Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for South Dublin County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1725 structured nearby appeal records.
1,725 matchedCitations are current-dated and carry policy name, section, page and source URL from the South Dublin County Council development plan.
1 matchedOpen preview
Open preview
Temporary change of use of part of unit 70 from light industrial to indoor gymnastics sports facility and associated site works.
(i) Demolition of the existing industrial buildings, (ii) construction of: (a) 252 'build-to-rent' apartments in a two to nine storey development. Each apartment has associated private open space in the form of a ground floor terrace or a balcony and has access to 613sq.m of internal communal amenity space (including a concierge and management facilities, communal gym, flexible meeting rooms, library/co-working space, lounge, cinema/multimedia room and external covered game area); 1792sq.m of external communal amenity space at first and second floor levels; and a 65sq.m external covered communal amenity area at first floor level. The development is served by an under-croft carpark accessible from the south-western corner of the site providing a total of 73 parking spaces (including 58 standard spaces, 10 go-car spaces and 5 mobility impaired user parking spaces) and 500 bicycle spaces at ground floor level (372 resident spaces and 128 visitor spaces); and (b) 2 commercial units (comprising of a 95sq.m unit accommodating a café/restaurant and a 145sq.m unit accommodating Class 1, 2 and 8 uses as per the Planning and Development Regulations, 2001-2019, as amended) and a 275sq.m crèche, with associated 86sq.m play area, at ground floor level; (iii) road, junction and streetscape upgrade works along Fourth Avenue and Cookstown Road, including the installation a signalized junction at the intersection of Fourth Avenue and Cookstown Road; (iv) Construction of a temporary access road along the southern site boundary; and (v) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary treatment; plant areas; ESB substations; and all associated site development works.
(i) Demolition of the existing industrial buildings, (ii) construction of: (a) 252 'build-to-rent' apartments in a two to nine storey development. Each apartment has associated private open space in the form of a ground floor terrace or a balcony and has access to 613sq.m of internal communal amenity space (including a concierge and management facilities, communal gym, flexible meeting rooms, library/co-working space, lounge, cinema/multimedia room and external covered game area); 1792sq.m of external communal amenity space at first and second floor levels; and a 65sq.m external covered communal amenity area at first floor level. The development is served by an under-croft carpark accessible from the south-western corner of the site providing a total of 73 parking spaces (including 58 standard spaces, 10 go-car spaces and 5 mobility impaired user parking spaces) and 500 bicycle spaces at ground floor level (372 resident spaces and 128 visitor spaces); and (b) 2 commercial units (comprising of a 95sq.m unit accommodating a café/restaurant and a 145sq.m unit accommodating Class 1, 2 and 8 uses as per the Planning and Development Regulations, 2001-2019, as amended) and a 275sq.m crèche, with associated 86sq.m play area, at ground floor level; (iii) road, junction and streetscape upgrade works along Fourth Avenue and Cookstown Road, including the installation a signalized junction at the intersection of Fourth Avenue and Cookstown Road; (iv) Construction of a temporary access road along the southern site boundary; and (v) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary treatment; plant areas; ESB substations; and all associated site development works.
The amendments to the permitted development will consist of: 1. Reduction in the overall height and internal and external re-configuration of permitted development resulting in the omission of 1 no. floor in Block A and C, and 2 no. floors of Block B to comply with Condition 2 of the permitted development. This will result in an overall reduction in units in the permitted development by 55 no. units from 252 no. units to 197 no. units; 2. Omission of 41 no. studio apartments which will be replaced with 15 no. 1-beds, 13 no. 2-beds and 2 no. 3-bed units including any associated elevational changes to balconies and window openings; 3. Revised layout at ground floor to remove podium courtyard, parking and service area which will be replaced with a new underground car park, entrance and service area; 4. Relocation of permitted creche to the ground floor corner of Blocks B and C and inclusion of an associated outdoor play area resulting in the omission of apartment no. 40 and relocation of tenant amenities/ community space to Block A to comply with Condition 2 of the permitted development; 5. Inclusion of plant equipment at roof level; and, 6. Inclusion of a blue roof drainage system at roof level of all permitted apartment blocks. 7. The development also includes all site development works necessary above and below ground necessary to facilitate the development.
(i) Demolition of the existing industrial buildings (2,518sq.m);(ii) Construction of a 'build-to-rent' housing development providing a total of 245 residential apartments (comprising 69 studio units, 56 one-bed units and 120 two-bed units) in a six to eleven storey building over basement. Each apartment has associated private open space in the form of a ground floor terrace or a balcony and has access to 21 communal amenity spaces (totalling 880sq.m), including a communal gym (82.5sq.m), and a ground floor level landscaped courtyard. The development is served by an underground carpark (accessed from the Cookstown Road extension currently under construction) providing a total of 79 parking spaces (including 75 standard spaces and 4 mobility impaired user parking spaces), and 468 bicycle spaces (388 resident spaces at basement level and 80 visitor spaces at ground floor level in the central courtyard and on street);(iii) 2 commercial units (comprising 129.4sq.m and 126.5sq.m and accommodating Class 1, 2 and 8 uses as per the Planning and Development Regulations, 2001-2019, as amended) at ground floor level; (iv) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary fences; plant areas; ESB substations; internal hard landscaping, including footpaths and street furniture; and all associated site development works.
28m of new secure metal fencing.
The brief summarizes the pattern across all 4,551 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record SD22A/0101The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief