Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Site 514, Greenogue Industrial Estate, Rathcoole, Co. Dublin.

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

17% of nearby decided applications were refused. The preview found 1,234 nearby planning records within 5 km where a location match is available.

Matched source
SD22A/0281
Project type
One-off house
Coverage
5 km radius
1,234Nearby applications
17%Refused
1,027Conditional grants
0Refusal reasons

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest similar decisions

SD22A/0281

Retention permission at site 514, Greenogue Industrial Park Rathcoole, Co Dublin for the First Floor Ancillary Offices measuring 216m2. All other development details remain as per granted planning permission Reg. Ref SD05A/0281

Granted0.0 km15 August 2022
SD25A/0101W

A new hazardous medical waste processing facility, including a change of use of the existing building (Building B) on site from general waste disposal to hazardous medical waste processing, and the extension of the current operating hours to 24/7 The demolition/removal of the existing outbuildings/structures including 2 no. storage units, an office and staff room canteen; The construction of an extension (c. 966 sqm) to the existing building c.1,577 sqm on site (Building B) and associated outbuildings including a new boiler house and storage areas; The construction of a new building (c. 984 sqm) to the northwest of the site (Building A); The construction of a new 2 storey office building (c. 287 sqm) to the southeast of the site; Provision of 26 no. car parking spaces, 5 no. truck parking spaces and 18 no. bicycle stands (30 no. spaces) to serve the proposed development; All ancillary landscaping, boundary treatments, associated infrastructure, internal roads, associated processing and treatment plant, weighbridges, pv panels, and site development works to support the development. The operation of the proposed development will require an Industrial Emissions Licence (IEL) from the Environmental Protection Agency. A Review of the existing IEL relating to the site will be sought from the Environmental Protection Agency in relation to the proposed development. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) will be submitted to the Planning Authority with the planning application and the EIAR and NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority.

Granted0.2 km18 December 2025
SD19A/0234

Amalgamation of Units 14A and 14B to create a single waste processing facility as follows: (1) demolition of a 60m long by 6m high internal wall, single storey site office and store and the removal of 3 portacabin offices; (2) change of use from timber recycling to hazardous waste processing and construction of a new hazardous waste processing Building A (1,831sq.m) with a 14.58 ridge height all at Unit 14A; (3) processing of hazardous waste within existing waste processing Building B and the construction of an extension (1,000sq.m) with a 14.60m ridge height to Building B; new two storey offices (288sq.m) with a 8.5m ridge height; new weighbridge and weighbridge office (40sq.m) and alterations to existing site layout to provide 25 car parking spaces, 4 truck parking spaces and 24 bicycle stands all at Unit 14B; (4) new internal circulation road and the relocation of existing weighbridge; new weighbridge; alterations to the surface water drainage systems; (5) installation of an aqueous waste treatment plant in the new waste processing Building A; (6) installation of a sewage sludge treatment plant in the extended waste processing Building B and associated odour control unit (32sq.m) with 18m high stack; (7) installation of a waste oil recovery plant in the extended waste processing Building B and associated natural gas boiler house and stores (102sq.m) with 16m high stack; (8) installation of a waste oil re-refining plant and storage tanks in the extended processing Building B and associated de-asphalting and fractionating columns (60sq.m total floor area) both with 16m high stacks and all ancillary and associated works; the proposed development entails a phased transition, hazardous waste and non-hazardous waste will be accepted and processed simultaneously at the waste facility and the total quantum of waste accepted will not exceed 95,000 tonnes per annum as permitted at the existing licenced waste facility; the proposed development will require a review of the Industrial Emissions Licence granted by the Environmental Protection Agency; an Environmental Impact Assessment Report (EIAR) is submitted with the application.

Refused0.2 km10 September 2019
SD22A/0310

A new waste handling building (561sqm and 12m high); Use of an existing building (159 sqm and 7.5m high) granted retention under SD22A/0100 for waste handling; elevational treatment including signage to the northern facade of the existing building granted retention under SD22A/0100; continued use of the existing building (427 sqm and 8.2m high) granted permission under SD06A/1097 and all ancillary site works. The development will comprise an activity requiring a review of the existing waste facility permit (WFP-DS-11-0002-06). The proposed development includes an increase in the total maximum annual waste intake to 20,000 tonnes. An Environmental Impact Assessment Report has been submitted with this application.

Granted0.2 km19 September 2022
SD22A/0100

Retention of existing building (159.25) currently not in use. Proposed use is intended as a recycling facility and this will be subject to a separate application.

Granted0.2 km01 June 2022
SD25A/0221W

The installation of Solar PV Panels to be mounted on the rooftop of an existing warehouse building and all associated ancillary infrastructure. PV Panels will not extend above parapet line.

Granted0.2 km11 November 2025

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required